Laserfiche WebLink
e. Removal frequency <br /> f. Remaining resource recovery potential <br /> g. Identification of final disposal site for residual <br /> wastes <br /> h. Distance and travel time to disposal site <br /> 6. Traffic <br /> a. Access routes - feeder roads <br /> b. Present loading - project induced loading - on and <br /> off-site <br /> C. Anticipated access alterations <br /> d. Scales - if any <br /> 7 . Materials Recovery <br /> a. Types <br /> b. Volume <br /> C. Storage <br /> d. Handling <br /> e. Transfer/sales and marketing <br /> 8. Energy recovery <br /> a. Amount <br /> b. Type (steam, electricity, etc. ) <br /> C. Uses <br /> d. Delivery mechanisms <br /> 9 . Facility induced air emissions <br /> a. Background air quality <br /> b. Project induced - from transfer or materials <br /> recovery facility operation and associated traffic <br /> C. Project induced - from energy recovery <br /> d. Control mechanisms/mitigations <br /> C-26 <br />