Laserfiche WebLink
PPI <br /> Significance <br /> After <br /> CATEGORY/ISSUE Significance PROPOSED MITIGATION MEASURES Measures <br /> Construction Phase Noise Potentially 11-1: Limit noise-generating construction activities Less than <br /> significant to the hours of 7:00 a.m.to 5:00 p.m.,Monday significant <br /> through Friday. <br /> 11-2: Locate fixed or portable noise sources,such as <br /> air compressors and concrete pumpers,as far as <br /> possible from the property line. <br /> 11-3: Equip all internal combustion engine-driven <br /> equipment with mufflers which are in good condition. <br /> N <br /> CYN Presence of Squirrels,Rats and Flies Potentially 12-1: Confine the waste handling operation to the Not <br /> significant Transfer Building. All doors,windows,and Significant <br /> unscreened openings should remain closed unless <br /> actually in use. <br /> 12-2: Contract with a pest control company to Not <br /> provide pest control services around the perimeter significant <br /> of the building as necessary. <br /> Light and glare on nearby residential properties Potentially 14-1: All on-site outdoor lighting should be directed Not <br /> significant so that the light source(i.e.bulb or lamp)is not significant <br /> visible from adjacent properties. <br /> Visual Effects of Project in the Project Vicinity Potentially 15-1: Adequate landscape area should be provided Less than <br /> significant along the project frontage on Lovelace Road significant <br /> Nuisance Litter Potentially 15-2: Litter control crews should police Lovelace Not <br /> significant Road,Union Road,and Airport Way on a periodic significant <br /> basis to remove any litter.. <br />