Laserfiche WebLink
0 0 Page 1 of 1 <br />Natalia Subbotnikova [EH] <br />From: Jaime Perez [jperez@sjgov.org] <br />Sent: Wednesday, August 15, 2007 7:44 AM <br />To: Natalia Subbotnikova [EH] <br />Cc: Desi Reno; Robert McClellon [EH]; Billy Baier; Michael Carroll; Dan Johnson; <br />Joldemeyer@aol.com; Sylvia Wilson; Maria Orozco; Roy Constantino; Manuel Chavez; Greg <br />Scheffel; Alison Hudson; Kimbra Andrews; Steven Carter <br />Subject: LOVELACE MRF&TS <br />Good morning Natalia, <br />M <br />1. The stalls shut down for the tipping floor repairs are still not being used. The concrete will <br />be tested today to see if it's reached the strength of 3,000 psi. If it has, we'll open those <br />stalls today or tomorrow. I'll keep you posted. Stay tuned. <br />2. 1 informed Robert on Monday that we've decided to proceed and relocate the <br />CRT's/Electronic Waste processing operations as described in our recent TPR <br />amendment. However, On Site Electronics Recycling, our contractor, will be purchasing <br />a new tent for their operations and expects to have the new tent in place at the new <br />location the week of September 10th <br />3. We're working on submitting to your department an update to the TPR to reflect the <br />current staging/processing of white goods/U waste. We hope to have something in draft <br />form to you by next week. <br />If you have any questions, please let me know. <br />Thank you. <br />Jaime L. Perez <br />Solid Waste Operations Manager <br />County of San Joaquin <br />Department of Public Works - Solid Waste Division <br />P.O. Box 1810 <br />Stockton, CA 95201 <br />P = 209.468.3066 <br />F = 209.468.3078 <br />8/15/2007 <br />