Laserfiche WebLink
Page 1 of 1 <br />Natalia Subbotnikova [EH] <br />From: Jaime Perez Uperez@sjgov.org] <br />Sent: Friday, January 11, 2013 2:06 PM <br />To: Natalia Subbotnikova [EH] <br />Cc: Desi Reno; Michael Carroll; Steven Carter; Billy Baier; Maria Orozco; Roy Constantino; Manuel <br />Chavez; Greg Scheffel; Marcus Davenport <br />Subject: RE: SWIS Online Inspection Report on behalf of: nsubbotnikova@sjcehd.com: Lovelace TS <br />Good afternoon Natalia, <br />Thank you for your LMRF&TS January 2012 inspection report. <br />As you are aware, the concrete was poured this past Tuesday, 1/8, in the <br />southwest area of the tipping floor. This area should be ready for use in about <br />three (3) — four (4) weeks. Once it's ready, I'll let you know. <br />With respect to the northwest area of the tipping floor that's being repaired, all <br />the prep work should be completed in about two (2) weeks. Once it's completed <br />the concrete will be poured. Therefore, this area should be ready to use by the <br />first week in March. At any rate, I'll keep you posted on the progress made. <br />If you have any questions, please let me know. <br />Thank you. <br />Jaime L. Perez <br />Solid Waste Operations Manager <br />County of San Joaquin <br />Department of Public Works - Solid Waste Division <br />P.O. Box 1810 <br />Stockton, CA 95201 <br />P = 209.468.3066 <br />F = 209.468.3078 <br />From: Natalia Subbotnikova [EH] [mailto:nsubbotnikova@sjcehd.com] <br />Sent: Friday, January 11, 2013 1:48 PM <br />To: Jaime Perez <br />Subject: FW: SWIS Online Inspection Report on behalf of: nsubbotnikova@sjcehd.com: Lovelace TS <br />1/11/2013 <br />