Laserfiche WebLink
Reporting Requirements: Annual Ca.nital Im rovement Program as approved <br />by the San Joaquin County Board of Supervisors <br />;ote: Measure No. 5-2 or Measure No. 5-3 should be implemented. <br />Mitigation Measure No. 5-4: The project proponent should reconstruct that portion <br />of Lovelace Road along the project frontage so that a two-way left turn lane (center turn <br />lane) can be added. <br />Monitoring Agency: Public Services Division <br />San Joaquin County Department of Public Works <br />Monitoring Schedule: Based on warrants established by the Traffic and <br />-Transportation Engineering Division of the San <br />Joaquin County Department of Public Works <br />Agency responsible for San Joaquin County Department of Public Works <br />Ensuring Compliance: <br />Reporting Requirements: Improvement Plan approval, inspection and Notice of <br />Completion <br />Mitigation Measure No. 5-5: A procedure should be established to provide for the <br />cleanup of waste spills due to traffic accidents associated with the Transfer Station. <br />(Refer to Appendix S of the Final EHL) <br />( .Monitoring Agency: <br />MMP: 7-6-93 <br />Office of Emergency Services <br />San Joaquin County <br />Page 2 of 9 <br />Attachment B <br />Monitoring Schedule: <br />As Encroachment Permit Applications are filed; and <br />as reflected in Public Works Capital Improvements <br />Program <br />Agency responsible for <br />Public Services Division <br />Ensuring Compliance: <br />San Joaquin County Department of Public Works <br />Reporting Requirements: <br />Review of Encroachment Permit Applications; annual <br />Capital Improvement Program <br />Alternate Measure <br />Mitic,ationMeasure No. 5-3: <br />- <br />Widen critical roadway segments on French Camp <br />RoaTand Airport Way to four travel lanes. (Cumulative Impact) <br />Monitoring Agency: <br />Traffic and Transportation Engineering Division <br />San Joaquin County Department of Public Works <br />Monitoring Schedule: <br />As reflected in the Public Works Capital <br />Improvement Program <br />Agency responsible for <br />San Joaquin County Department of Public Works <br />Ensuring Compliance: <br />Reporting Requirements: Annual Ca.nital Im rovement Program as approved <br />by the San Joaquin County Board of Supervisors <br />;ote: Measure No. 5-2 or Measure No. 5-3 should be implemented. <br />Mitigation Measure No. 5-4: The project proponent should reconstruct that portion <br />of Lovelace Road along the project frontage so that a two-way left turn lane (center turn <br />lane) can be added. <br />Monitoring Agency: Public Services Division <br />San Joaquin County Department of Public Works <br />Monitoring Schedule: Based on warrants established by the Traffic and <br />-Transportation Engineering Division of the San <br />Joaquin County Department of Public Works <br />Agency responsible for San Joaquin County Department of Public Works <br />Ensuring Compliance: <br />Reporting Requirements: Improvement Plan approval, inspection and Notice of <br />Completion <br />Mitigation Measure No. 5-5: A procedure should be established to provide for the <br />cleanup of waste spills due to traffic accidents associated with the Transfer Station. <br />(Refer to Appendix S of the Final EHL) <br />( .Monitoring Agency: <br />MMP: 7-6-93 <br />Office of Emergency Services <br />San Joaquin County <br />Page 2 of 9 <br />