Laserfiche WebLink
V. IMPACT OVERVIEW <br /> TABLE V-1 <br /> COMPARISON OF THE MITIGATED IMPACTS OF THE PROPOSED PROJECT AND THE ALTERNATIVES <br /> Alternative 1: Alternative 2: Alternative 3: <br /> Impact Proposed Project No Project Reduce-Scale Off-Site <br /> C. Traffic Circulation and Safety(continued) <br /> 2. Traffic generated by the proposed project would LS —N —LS +/=LS <br /> contribute to cumulative traffic volumes on roadways <br /> serving the project site. <br /> 3. The proposed project would increase traffic volumes on LS —N —LS +/=LS <br /> roadways in the vicinity of the project site, increasing <br /> the potential for traffic safety problems. <br /> 4. The proposed project would generate turning LS —N —LS =LS <br /> movements by vehicles to and from site driveways. <br /> D. Noise <br /> 1. Construction associated with the proposed expansion of LS —N =LS —LS <br /> the Stockton Scavenger Transfer Station would <br /> temporarily and intermittently increase noise levels at <br /> nearby sensitive receptor locations. <br /> 2. Operation of the expanded transfer station would SU —N —SU —LS <br /> generate substantial levels of noise that would adversely <br /> affect the noise environment of nearby land uses. <br /> Comparisons to Project Comparisons to Setting <br /> + Greater impact than that of the proposed project LS Less than significant adverse impact after mitigation <br /> Lesser impact than that of the proposed project SU Significant and unavoidable adverse impact after mitigation <br /> Same(or similar)impact as that of the proposed project N No impact or negligible impact <br /> +/= Approximately the same impact as or potentially greater impact than that of the proposed project * Not applicable <br /> —/= Approximately the same impact as or potentially lesser impact than that of the proposed project B Beneficial <br /> ? Magnitude of change relative to the project or level of significance cannot be determined <br /> a Significance levels for the project and the alternatives reflect the levels of significance after mitigation. Symbols indicate maximum impact during construction and operation, <br /> unless otherwise specified. <br /> Stockton Scavengerrran.xjerStation Erpunsion V.10 ESA/990/90 <br />