Laserfiche WebLink
TABLE OF CONTENTS <br /> STOCKTON SCAVENGERS TRANSFER STATION EXPANSION <br /> Pane <br /> EXECUTIVE SUMMARY S.1 <br /> I. INTRODUCTION I.1 <br /> A. Project Background I.I <br /> B. Purpose of this Supplemental EIR I.1 <br /> II. PROJECT DESCRIPTION II.1 <br /> A. Project Objectives II.1 <br /> B. Site Description II.I <br /> C. Current Operations IL 1 <br /> D. Proposed Transfer Station Operations II.4 <br /> E. Plans and Policies II.8 <br /> III. ENVIRONMENTAL SETTING,IMPACTS,AND <br /> MITIGATION MEASURES III.A.1 <br /> A. Land Use III.A.I <br /> B. Air Quality III.B.I <br /> C. Traffic Circulation and Safety III.C.I <br /> D. Noise III.D.1 <br /> E. Cultural Resources III.E.1 <br /> F. Hydrology and Water Quality III.F.1 <br /> G. Public Health and Safety III.G.I <br /> IV. IMPACT OVERVIEW IVA <br /> A. Growth-Inducing Effects of the Proposed Transfer Station Expansion IV.I <br /> B. Cumulative Impacts IV•I <br /> C. Unavoidable Significant Adverse Impacts IVA <br /> D. Effects Found Not To Be Significant IVA <br /> V. ALTERNATIVES TO THE PROJECT V.1 <br /> A. No Project Alternative V.I <br /> B. Reduced Project Alternative V.2 <br /> C. Project in Different Location VA <br /> D. Environmentally Superior Alternative V.6 <br /> VI. REPORT PREPARERS, ORGANIZATIONS,AND <br /> PERSONS CONSULTED VIA <br /> Stockton Scavenger TransJ'er Station Erpansion 11 ESA/990/90 <br />