Laserfiche WebLink
TABLE 5-2 <br /> CAPITAL COSTS <br /> RESOURCE RECOVERY FACILITY <br /> ($1,000) <br /> Conversion of Transfer Station Additional Cost for Electric <br /> to Steam Plant Power Production <br /> Item Cost Item Cost <br /> Site Preparation $ 587 Site Preparation $ 33 <br /> P p <br /> (Includes Foundations) <br /> Buildings 8 <br /> Building 113 <br /> Turbo Generator 230 <br /> Spare Parts-Tools 70 <br /> Water Treatment 32 <br /> Rolling Stock 35 <br /> Mechanical 5 <br /> Package Incinerators 1,900 <br /> Electrical 41 <br /> Equipment <br /> Steel Pan Conveyors 209 Cooling Tower 36 <br /> Rubber Belt Conveyors 185 <br /> Rotary Screen 110 Condenser 21 <br /> Dust & Flue Gas 155 <br /> Collection <br /> Chutes, Bins, Hoppers 35 <br /> Mechanical 50 <br /> Electrical <br /> 20 <br /> Subtotal $3,469 $406 ` <br /> Contingency @ 15% $ 520 $ 61 <br /> General Contractor's 347 41 <br /> Fee @ 10% <br /> Engineering @ 10% 347 41 <br /> Finance @ 20% j 694 81 <br /> Total $5,377 $630 <br /> - 32 - <br />