Laserfiche WebLink
, <br /> TRACY MATERIALS RECOVERY &TRANSFER FACILITY <br /> RFI AMENDMENT NO. 3 <br /> approval of the Contingency Plan with as commitment to formalize the plan in <br /> 2007 during the SWFP Revision process. <br /> As part of the SWFP Revision, and further expansion of the compost facility with <br /> potential food waste types where the compost leachate would change, Tracy <br /> Material Recovery and Transfer Station is committed to evaluate these issues <br /> relative to the CEQA process and formalize a contingency plan in 2007 with a <br /> wastewater treatment plant. <br /> EDGAR&ASSOCIATES, INC. 11 NOVEMBER 6, 2006 <br />