My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 11:16:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_1993.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage Calculations <br /> Peak discharges and average velocities were calculated to adequately size drainage ditches and <br /> drain pipes by means of the Rational Method. Subwatershed slopes, areas, and overland flow <br /> lengths were obtained directly from the preliminary drainage plan and existing topography. <br /> Drain pipes and ditch configurations were modeled with FLOWMASTER to obtain velocities <br /> used in travel time calculations. Rainfall intensities used in the Rational Method calculations <br /> were based on rainfall intensity curves developed by the County of San Joaquin, Department of <br /> Public Works. Runoff coefficients ranging from 0.20 to 0.95 were used based on specifications <br /> from the Runoff Coefficient Standard, San Joaquin Improvement Standards, September 1991. <br /> Rainfall intensity curves were obtained from Standard Drawings D-4 and D-5. Hydrology <br /> calculations are included in Table E-1. <br /> Drainage Pipes and Ditches <br /> All closed conduits and drainage ditches have been designed to prevent overtopping during a 10- <br /> year/24-hour frequency precipitation event. Diversion ditches around the Composting area have <br /> been designed to prevent overtopping during the 25-year/24-hour precipitation event of 2.25 <br /> inches in accordance with CCR Title 14. <br /> All drainage pipes will be manufactured from polyvinyl cloride (PVC) and range from 8 to 21 <br /> inches in diameter. Drainage pipes will be placed at a minimum grade of 0.5%. Drainage <br /> ditches will be graded at a minimum slope of I% and will be a minimum of I foot deep with <br /> 2:1 side slopes. <br /> Retention Basin <br /> The proposed retention basin will retain all surface runoff generated from the site. The only <br /> outlet from the basin is by means of evaporation and percolation. The retention basin was <br /> designed to accommodate twice the volume of runoff generated from a 10-year/24-hour <br /> precipitation event (0.06 inches/hour) in accordance with San Joaquin County Improvement <br /> Standards, September 1991. <br /> LAPROJECT\397MAIN.M �Dmbcr 1993 <br /> E-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.