Laserfiche WebLink
Waste Loading (Open Top): Number of available loading bays = 2, at 15 min. loading <br /> time per trailer the hourly loading = 2 bays x 4 per hr. x <br /> 20 tons = 160 tph. <br /> mum Loading hours = 400 tpd / 160 tph =_ZLbn <br /> RMAU. <br /> Material Sorting: Number of lines = I with 12 sorters, hourly sorting rate <br /> for curbside material = 0.5 tph per sorter x 12 sorters = <br /> 6 tph, hourly sorting rate for other sorted material = 0.75 <br /> tph per sorter x 12 sorters = 9 tph. <br /> Minimum total sorting hours = (40 tpd / 6 tph) + (50 tpd <br /> / 9 tph) = 12.2 hrs. ner day= <br /> Material Loading: Assume 20 ton truck loading at I per hour with 2 bays <br /> 40 tph. <br /> Minimum loading hours = 230 tpd 40 tph =-5jLhLL-= <br /> Lay. <br /> Baling: Average 20 tph per baler x I baler = 20 tph. <br /> Minimum baling hours = 140 tpd 20 tph =-Z-bLL-Mr <br /> dgy assuming all recycled material is baled. <br /> Conclusion <br /> 1. Tipping floor has a capacity for 2.9 days of waste storage. <br /> 2. All waste transfer and material sorting and processing can be accomplished within the <br /> proposed facility operating hours for 800 tpd of incoming material. <br /> I—VROJECrO"WRF*UMC".DS Docantw Is,Ips <br /> F-3 EMWWWWOIDGMS <br />