Laserfiche WebLink
7. The portion of McArthur Drive used by haul trucks leaving the site, plus any pavement <br /> within the construction area will be cleaned as necessary using rotary brushes with <br /> sufficient wetting. <br /> Eauh)ment <br /> A potable water well installed on site should provide an adequate source of water for <br /> construction operations including dust control. Watering will be performed by at least one water <br /> truck on site each day. <br /> A dust palliative meeting Caltrans Standard Specifications will be added to water used for dust <br /> control. Any soil stabilizers will meet State Water Quality Control Board standards. <br /> L:\PROJEC'r\39MRFWM".I 1-4 <br />