Laserfiche WebLink
TRACY MATERIALS RECOVERY &TRANSFER FACILITY <br /> RFI AMENDMENT NO. 3 <br /> INTRODUCTION <br /> This is the third Report of Facility Information (RFI) amendment prepared for the <br /> Tracy Material Recovery and Transfer Station. The previous RFI Amendments <br /> were for the following activity: <br /> RFI Amendment No 1 September 1996 <br /> ® Processing of cannery wastes <br /> RFI Amendment No. 2 November 2004 <br /> • Storage of glass in outdoor bunkers <br /> This RFI Amendment will encompass the operational modifications resulting from <br /> changes in laws and regulations, and includes the following activity: <br /> RFI Amendment No 3 August 2006 <br /> Storage and processing of inert materials <br /> Storage and processing of construction and demolition materials <br /> Storage and processing of appliances <br /> Storage of universal wastes <br /> Storage of electronic wastes <br /> Modifications of the yard waste composting area <br /> Modifications of the wood waste processing area <br /> Building Addition for storage and baling of source-separated fibers <br /> ® Review of drainage facilities <br /> Tracy Material Recovery and Transfer Station (TMR/TS) in conjunction with the <br /> City of Tracy have adopted an Enhanced 2005 Diversion Plan to "Recycle More <br /> Than Before". Plans are being devised to expand all types of recycling activity at <br /> the TMR/TS that will be a "significant change" to the design and operations of the <br /> facility which will cause a Solid Waste Facility Permit Revision (SWFP) to occur <br /> in 2007. <br /> The next Five-Year Permit Review is March 7, 2007. It is anticipated that Tracy <br /> Material Recovery and Transfer Station will be involved a CEQA process during <br /> March 2007 and that the Five-Year Permit Review will need to be in March 2007, <br /> or wrapped into the SWFP Revision, as directed by the LEA . <br /> It is also anticipated that additional modifications to current operation could be <br /> proposed during 2006 or 2007, based upon the implementation items that are <br /> approved as part of the Enhanced 2005 Diversion Plan causing a RFI <br /> Amendment No. 4 to be submitted 30 days prior to operations. <br /> EDGAR&ASSOCIATES, INC. 1 NOVEMBER 6, 2006 <br />