Laserfiche WebLink
Part 3. FACILITY INFORMATION <br /> A.PROPOSED CHANGE(Check applicable box(es)): <br /> ®1.DESIGN(describe):Add biomassgasifier;add C&D Processing Line; add aeration equipment for composting; <br /> increase design capacity. <br /> Increase daily tonnage to 1,800 TPD; expand C&D operations area and capacity; increase <br /> public materials receipt hours; increase Inert Debris processing area; increase hours for <br /> 12. <br /> OPERATION(describe): processing: increase traffic volume: add food waste to composting feedstocks. <br /> M3. OWNER,OPERATOR,ADDRESS,AND/OR FACILITY NAME CHANGE(describe): n/a <br /> M4.OTHER(describe): n/a <br /> B.FACILITY INFORMATION: <br /> 1.INFORMATION APPLICABLE TO ALL FACILITIES: <br /> a. PEAK DAILY TONNAGE OR CUBIC YARDS 1,800 TPD(MSW), 1,038 Tons per week(composting) <br /> 1) DISPOSALfTRANSFER(unit) 1,800 TPD <br /> 2) OTHER(unit) n/a <br /> b. DAILY DESIGN TONNAGE(TPD) TPD <br /> c. FACILITY SIZE(acres) 51.7 <br /> d. PEAK TRAFFIC VOLUME PER DAY(vpd) 1,245 VPD <br /> Hours for Receipt of Materials: Commercial,4 AM to 6 PM/Monday-Saturday;Self haul,6 <br /> AM to 6 PM/Monday-Saturday. Processing hours: Indoors-24 hours/Monday-Sunday, <br /> Outdoors-6 AM to 10 PM/Monday-Sunday. Maintenance Hours: 24 hours/Monday-Sunday. <br /> e. DAYS AND HOURS OF OPERATION <br /> 2.ADDITIONAL INFO.REQUIRED FOR COMPOSTING FACILITIES ONLY: <br /> a. SITE STORAGE CAPACITY(cu yds) 49,200 cu.yds. <br /> DDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br /> qW <br /> a. AVERAGE DAILY TONNAGE(TPD) n/a <br /> b. SITE CAPACITY CURRENTLY PERMITTED(Airspace)(cu yds) n/a <br /> c. SITE CAPACITY PROPOSED(Airspace)(cu yds) n/a <br /> d. SITE CAPACITY USED TO DATE(Airspace)(cu yds) n/a <br /> e. SITE CAPACITY REMAINING(Airspace)(cu yds) n/a <br /> f. DATE OF CAPACITY INFORMATION(Date)(See instructions): n/a <br /> g. LAST PHYSICAL SITE SURVEY(Date) n/a <br /> h. ESTIMATED CLOSURE DATE(month and year) n/a <br /> i. DISPOSAL FOOTPRINT(acres) n/a <br /> j. SITE CAPACITY PLANNED(cu yds) n/a <br /> k. 1. (i) IN-PLACE WASTE DENSITY(lbs of waste per cu yd of waste) n/a <br /> AND <br /> (ii)WASTE-TO-COVER RATIO(Estimated)(v:v) n/a <br /> OR <br /> 2. AIRSPACE UTILIZATION FACTOR(tons of waste per cu yd of landfill airspace) n/a <br /> Part 4.SOURCE OF WATER SUPPLY(Check applicable boxes) <br /> ❑A. MUNICIPAL OR UTILITY SERVICE: <br /> X�B.INDIVIDUAL(wells): All water for facilityoperations, including erations <br /> p g potable water will be obtained from an on site <br /> supply well. <br /> C.SURFACE SUPPLY: <br /> 1.NAME OF STREAM,LAKE,ETC.: <br /> 2.TYPE OF WATER RIGHTS: <br /> FiRIPARIAN ❑APPROPRIATION <br /> 3. STATE PERMIT OR LICENSE NUMBER,IF APPLICABLE: <br /> Page 2 <br />