Laserfiche WebLink
Part 3.FACILITY INFORMATION <br /> A.PROPOSED CHANGE(Check applicable box(es)): <br /> Ell.DESIGN(describe):Add biomass gasifier; add C&D Processing Line;add aeration equipment for composting; <br /> Increase design capacity. <br /> Increase daily tonnage to 1,800 TPD;expand C&D operations area; increase Inert Debris <br /> processing area; increase hours for receipt of materials;increase hours for processing; <br /> x 2.OPERATION(describe): processing <br /> traffic volume. <br /> ❑3. OWNER,OPERATOR,ADDRESS,AND/OR FACILITY NAME CHANGE(describe): n/a <br /> F�4.OTHER(describe): n/a <br /> B.FACILITY INFORMATION: <br /> 1.INFORMATION APPLICABLE TO ALL FACILITIES: <br /> a. PEAK DAILY TONNAGE OR CUBIC YARDS 1,800 TPD(MSW), 1,038 Tons per week(composting) <br /> 1) DISPOSAL/TRANSFER(unit) 1,800 TPD <br /> 2) OTHER(unit) n/a <br /> b. DAILY DESIGN TONNAGE(TPD) TPD <br /> c. FACILITY SIZE(acres) 51.7 <br /> d. PEAK TRAFFIC VOLUME PER DAY(vpd) 1,245 VPD <br /> Hours for Receipt of Materials:24 hours/Monday-Sunday,Self haul,6 AM to 6 PM/Monday- <br /> Sunday. Processing hours: Indoors-24 hours/Monday-Sunday,Outdoors-6 AM to 10 <br /> e. DAYS AND HOURS OF OPERATION PM/Monday-Sunday.Maintenance Hours: 24 hours/Monday-Sunday. <br /> 2.ADDITIONAL INFO.REQUIRED FOR COMPOSTING FACILITIES ONLY: <br /> a. SITE STORAGE CAPACITY(cu yds) 49,200 cu.yds. <br /> 3.ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br /> i. AVERAGE DAILY TONNAGE(TPD) n/a <br /> b. SITE CAPACITY CURRENTLY PERMITTED(Airspace)(cu yds) n/a <br /> c. SITE CAPACITY PROPOSED(Airspace)(cu yds) n/a <br /> d. SITE CAPACITY USED TO DATE(Airspace)(cu yds) n/a <br /> e. SITE CAPACITY REMAINING(Airspace)(cu yds) n/a <br /> f. DATE OF CAPACITY INFORMATION(Date)(See instructions): n/a <br /> g. LAST PHYSICAL SITE SURVEY(Date) n/a <br /> h. ESTIMATED CLOSURE DATE(month and year) n/a <br /> L DISPOSAL FOOTPRINT(acres) n/a <br /> J. SITE CAPACITY PLANNED(cu yds). n/a <br /> k. 1. (i) IN-PLACE WASTE DENSITY(Ibs of waste per cu yd of waste) n/a <br /> AND <br /> (ii)WASTE-TO-COVER RATIO(Estimated)(v:v) n/a <br /> OR <br /> 2. AIRSPACE UTILIZATION FACTOR(tons of waste per cu yd of landfill airspace) n/a <br /> Part 4.SOURCE OF WATER SUPPLY(Check applicable boxes) <br /> F�A. MUNICIPAL OR UTILRY SERVICE: <br /> 7B.INDMDUAL(wells): All water for facility operations,including potable water will be obtained from an on site <br /> ❑C.SURFACE SUPPLY: supply well. <br /> 0 1.NAME OF STREAM,LAKE,ETC.: <br /> 2.TYPE OF WATER RIGHTS: <br /> =RIPARIAN MAPPROPRIATION <br /> 3. STATE PERMIT OR LICENSE NUMBER,IF APPLICABLE: <br />