My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:41:08 AM
Creation date
7/3/2020 11:17:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-0800005 <br /> TRACY MATERIALS RECOVERY,INC. <br /> Use Permit Application No. PA-0800005 was approved by the San Joaquin County Planning <br /> Commission on February 2,2012. The effective date of approval is February 12,2012. This approval <br /> will expire on August 13,2013,which is 18 months from the effective date of approval, unless (1) all <br /> Conditions of Approval have been complied with, (2) all necessary building permits have been <br /> secured and remain in force, and (3) all necessary permits from other agencies have been secured <br /> and remain in force. <br /> Unless otherwise specified,all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1) COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact:John Funderburg,468-3160) <br /> a) BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage,driveway access details including gates,on-site <br /> parking,landscaping,signs,existing and proposed utility services,and grading(refer to the"SITE <br /> PLAN CHECK LIST"for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b) APPROVED USE: This approval is for the expansion of an existing solid waste processing and <br /> recycling facility from 39.2 acres to 51.7 acres in two phases over twenty years with a maximum of <br /> 1,727 vehicles per day at final build out as shown on the Revised Site Plan dated June 22, 2011. <br /> (Use Type: Major Impact Services) Phase 1 to increase the daily waste capacity from 1,000 <br /> tons per day (TPD) to 1,800 TPD within ten years from the date of approval. Building permits <br /> for Phase 1 site improvements to be issued within eighteen months from the date of approval. <br /> i) Phase 1 site improvements will include: <br /> (1) Addition of 19,200 square feet to the existing 57,200 square foot material recovery facility <br /> and transfer station building, <br /> (2) Addition of 10,500 square feet to the existing maintenance and administration building, <br /> (3) Construction of a one mega-watt wood waste bio-mass gasification unit. <br /> (4) Construction of a 5,000 square foot covered storage area and loading dock <br /> ii) Phase 2 to increase the daily waste capacity from 1,800 TPD to 2,500 TPD within twenty <br /> years from the date of approval. An Improvement Plan for Phase 2 shall submitted 180 days <br /> prior to the increase in daily waste capacity. The Improvement Plan shall include a revised <br /> Solid Waste Facility Permit. <br /> iii) The project will employ 160 persons and operate 24 hours a day, 7 days a week.All outdoor <br /> processing activities will not begin before 6:00 am and will not operate after 10:00 pm. On <br /> site activities to include vehicle maintenance, equipment storage and truck parking, <br /> processing of construction and demolition of inert debris, chipping/grinding of wood waste, <br /> Conditions of Approval - 1 - PA-0800005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.