Mitigation Measure Implementing Timing of <br /> Method of Verification Party Verification Monitoring Party <br /> • Unpaved Road Speeds.The <br /> construction contractor shall <br /> limit traffic speeds on unpaved I I <br /> roads to 15 mph. <br /> • Erosion Control: The ( j <br /> construction contractor shall <br /> install gravelbags or other <br /> erosion-control measures to <br /> prevent silt runoff to public j I <br /> roadways from sites with a <br /> slope greater than 1 percent <br /> during ground-disturbing i <br /> activities. i <br /> • Wind Breaks.The construction <br /> contractor shall install and I <br /> maintain wind breaks at I <br /> windward side(s)of ( I I <br /> construction areas throughout <br /> construction activities. i <br /> • High Winds:The construction <br /> i contractor shall suspend <br /> excavation and grading activity <br /> when winds exceed 20 miles j <br /> per hour. j <br /> onstruction Equipment <br /> I off-road construction equipment <br /> used within project area shall conform i <br /> to the United States Environmental <br /> j Protection Agency's Tier 3 or higher j <br /> emissions standards.The construction j <br /> contractor shall be made <br /> j aware of this requirement prior to the <br /> start of construction activities. Use of <br /> Tier 3 or higher off-road construction <br /> equipment shall be stated on all <br /> I grading plans. The construction <br /> contractor shall maintain a list of all <br /> operating equipment in use on the <br /> project site.The construction <br /> equipment list shall state the makes, I <br /> models, and numbers of construction j <br /> equipment onsite and shall be made <br /> available, upon request, to the San <br /> Joaquin Valley Air Pollution Control <br /> 1 District. <br /> I <br /> I The construction contractor shall <br /> • Conditions of Approval - 13- PA-0800005 <br />