Laserfiche WebLink
d) Substantially alter the existing 1771 F1 X 171 <br /> drainage pattern of the site or <br /> area, including through the <br /> alteration of the course of a <br /> stream or river, or substantially <br /> increase the rate or amount of <br /> surfaceirunoff in a manner <br /> which would result in floogjng <br /> on-or off-site? <br /> e) Create'or contribute runoff El 1:1X E] <br /> water'which would exceed the <br /> capacity of existing or planned <br /> storm water drainage systems <br /> or prc iirle substantial <br /> additional sources of polluted <br /> r'unoff7 <br /> f) Otherwise substantially El X El <br /> degrade.water quality? <br /> g) Place housing within a 100- E] ❑ X <br /> year flood hazard area as <br /> mappgd on a federal Flopo <br /> Mazarg..Boundary or Flood <br /> Insurance Rate Map or other <br /> flood.htiazard delineation map? <br /> h) Place.Within a 100-year flood ® � [] X <br /> hazard,area structures which <br /> would 4pipede or redirect.good <br /> Adak flows?.: <br /> i) Expose people or structures to [] ® X <br /> a significant risk of loss, injury <br /> . . .. .. .. ...or death involving flooding, <br /> includigg flooding as a result of <br /> the faU.ire of a levee or dam? <br /> j) Inundation by seiche,tsunami, El El F <br /> X <br /> or mudPlow? <br /> Comments: <br /> a-f) The MRF.ttas been exempt from waste discharge requirements by the California Regional <br /> Water Quadty Control Board(CRWQCB)since 1994. Resolution Order No. 94-081 adopted by <br /> the C.RWQ,CB on February 2;3, 1994,granted the MRF a waiver from all waste.discharge <br /> requirements. It is:assumed;by the project applicants'the waiver is still in effect today. <br /> The storm water runoff from all areas except the wood storage and yard wastes composting <br /> area will drain to anion-site retention pond.The retention pond will be sized to contain 200 <br /> percent of-,the computed volume of runoff from the 106 year/24-hour storm.The pond shall <br /> also be designed to empty by percolation and evaporation 100 percent of the required <br /> volume ofstorage within 10 days.Storm-water runoff from the wood storage and compost <br /> concrete pad area will drairrto an on-site clay-lined evaporation pond. Because the <br /> evaporation pond.Is conservatively sized for the 100 year/24 hour storm, it also meets the <br /> draft•.proyj( dons of Composting.Facilities Permitting Procedures and Enforcement(Section <br /> 17873,Chapter 3.1,Title 14 CCR) requiring the design to contain and collect twice the <br /> anticipated.volume of compgst leachate management system,which includes the <br /> evaporatiap,pond, has beerkdesigned to recycle the collected compost leachate to the <br /> compost processing area or to evaporate the compost leachate within 20 days. <br />