Laserfiche WebLink
Item No.2 ' <br /> PC: 12-16-93 <br /> ER-93-1 JUP-93-4 <br /> Page 9 <br /> f. Landscaping shall be installed in accordance with the approved Site Plan and <br /> Improvement Plan. Landscaping details shall be-consistent with Chapter 9-1020 of <br /> Development Title, be included on the Improvement Plan, the <br /> issuance of the Certificate of Occupancy and be installed prior to <br /> p cY for the office/maintenance building. <br /> 9• Litter shall be picked up on a daily basis on the project site and-along the site's fronts e <br /> on MacArthur Drive. Litter shall be picked u on surrounding Properties as needed. g <br /> P . P 9P. .p <br /> h• Except.for the wood and yard waste composting operations, all w • <br /> transfer operations shall take place within the approved transfer building. handling and <br /> i All doors,windows,and unscreened openings at the transfer building shall remain closed <br /> unless in actual use- <br /> j. All new cuts and .fills shall be consistent with the geotechnical recommendations <br /> contained in Appendix F of the Final EIR. In areas where slopes are steeper than 2:1, the <br /> following mitigation measure shall be implemented: regrade slopes to 21 or flatter, or se <br /> back all improvements at least 30 feet from the top and bottom of slopes, or erect <br /> landslide debris barriers. <br /> k. Construction of fills,foundations, slabs,and roadways-on the site shall be in a <br /> with the s contained in A accordance <br /> 9 eotechnical recommendation <br /> • Appendix F of the Final EIR. <br /> 1• Placement of plastic sheeting,debris fences, silt fences; and/or hay bales shall be utilized <br /> to protect disturbed surfaces during storms during construction activities. Following <br /> construction, all disturbed surfaces, especially slopes, shall be revegetated. <br /> M. The area where the windrows will be located for the outdoor wood and and w <br /> composting shall be paved. y este <br /> n. Personnel working with the'load screening program'and on the'tippin floor shall <br /> 40 hours of OSHA training on spill containment, personal protective equipment, and he <br /> handling of recyclable household hazardous materials. <br /> o. Any mitigation monitoring done by the Community Development De pash <br /> done on a time and materials basis paid for by the applicant. P " all be <br /> 2• AIR POLLiJT10N CONTROL DISTRICT: <br /> a• A PM10 Dust Prevention and Control Plan shall be prepared that includes the dust contro I <br /> measures specified in Chapter 4.7, Mitigation 4.7-1, of,the Final EIR. <br /> b. <br /> A Standard Operating Procedure (SOP)shall be developed to address the elimination of <br /> the generation and emission of odgrs as much as possible. The SOP shall include <br /> measures to allow for the shortest possible holding time of waste brought to the facility, <br /> . as well as contingency `t- <br /> 9 cy measures in the event of excess odor generation anal/or nuisance <br /> complaint. <br />