My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:41:08 AM
Creation date
7/3/2020 11:17:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i- <br /> Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> F Page 15 <br /> 'Changes or afterations have been required in, or incorporated into, the project which avoid <br /> or <br /> substantially lessen the significant environmental effect as identified in the Final EIR. These <br /> mitigation measures are listed below. <br /> Statement of Fact- <br /> This impact will be reduced by the following: <br /> • If necessary. rp •• <br /> as determined by the Airport Land Use Commission after operations begin, <br /> bird netting, a noise system. or other means to ward off birds shall be installed. <br /> B. VEGETATION AND WILDLIFE RESOURCES <br /> B.1. Potential Si nlfiicant lm act. Potential direct mortal' of the San Joa uin kit fox Burin <br /> construction and round disturbin 'activities: <br /> Finding: <br /> Changes or alterations have been required in, or incorporated into, the project which av " <br /> substantially lessen the significant environmental effect as identified in the Final EIR. o�d or <br /> Statement of Facr. <br /> This impact will be reduced by the following: <br /> Not more than 60 days prior to construction, a professional biologist retained by the <br /> applicant shall conduct a preconstructlon survey of the site for the presence of the San <br /> Joaquin kit fox. If any kit foxes are found,precautions specified in Chapter 4.2, Condition <br /> 4.2-4, of the Final EIR shall be taken. <br /> 8.2. Potentiall Si ri ficant Im act: Potential disturbance breedin or winterin burrowin owls. <br /> Finci'n�C. . <br /> Changes or alterations have been required in, or incorporated into, the project which avoid or <br /> substantially lessen the significant environmental effect as identified in the Final EIR. <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> Not more than 60 days prior to construction, a professional biologist retained by the C <br /> applicant shall conduct a preconstruction survey of the site for the presence.of burrowing <br /> owls. If any owls are found, precautions specified in Chapter 4.2, Condition 4.2-6, of the <br /> Final EIR shall be taken. <br />
The URL can be used to link to this page
Your browser does not support the video tag.