Laserfiche WebLink
COPY . <br /> GENE^nAy CONSIDERATIANS: <br /> 1_ Does it appear that any environmental* feature of the project <br /> will generate significant public concern or controversy? f <br /> ( ) Yes (X) No Nature of concern(s) : f_(,(_ I <br /> 2- Will the project require approval or permits by agencies other <br /> than the County? Yes ( ) No <br /> Agency name(s) <br /> 3 : Is theproject within the Sphere of Influence, or within tato <br /> miles, of any city? <br /> ( ) Yes (X) No City: JL(� <br /> E.W, 1R0NMENTAIL IMPACTS: <br /> "Yes" may only be checked in situations where there is substantial evidence to . <br /> indicate that .there may be a significant adverse impact: on the environment if <br /> there is -no change in the project <br /> description—(OMAN Guidelines,. Sec. ,15064) <br /> See the ^Discussion" section at the end of the Initial Study for explanation of <br /> any impacts checked "Yes', or any "No" answer marked with an asterisk (A) . <br /> Sou=ces. The following sources of information have been used in determining <br /> environmental im-oacts: <br /> or-Ig nal source materials and maps on file in the Community Development <br /> Depa:t-went including: all County and City general plans and community plans; <br /> assessor parcel books; various local and F-71CL flood zone maps; service dist=,ct <br /> maps; maps of geologic izstab4lity; maps and reports on endangered species such <br /> as the Natural Diversity Data,Hase; noise contour mans; specific roadway plans; <br /> maps and/or records of archeolog_cal/historic resour:es; soil reports and maps; <br /> etc_ zany of these original source materials have -been collected from other <br /> public agencies or from previously prepared EI,,.s and other technical studies. <br /> Additional standard sources which should be spec-ifically cited below include <br /> on-site visits by staff (note date); staff 1mowledge or expe=fence; and . <br /> i zdeoendent environmental studies submitted to the County' as parr of the proj ect <br /> applicat°on (note report title, date, and consultant) . <br /> YES NO <br /> a.. is anv portion of the project 4: <br /> subject to 'Flood hazard? <br /> Flood zcne C.. <br /> Initial Study (Rev•01Js1) <br /> 2 <br />