Laserfiche WebLink
Transfer/Processing Report <br /> Tracy Material Recovery and Transfer Facility <br /> 30703 S. MacArthur Drive, Tracy, California 95377 <br /> PREFACE <br /> This Transfer/Processing Report (TPR) is the operations plan and permitting <br /> document to revise the existing Full Solid Waste Facilities Permit (SWFP)(SWIS <br /> No. 39-AA-0024) for the Tracy Material Recovery Facility and Transfer Station <br /> (MRF/TS). A TPR is required by the California Code of Regulations (CCR), Title 14, <br /> Section 18221.6, to describe the operations of a facility in order to obtain a Full <br /> Solid Waste Facilities Permit (SWFP); it describes in detail the operations of the <br /> MRF/TS and identifies operational changes requiring the revision of the SWFP. The <br /> purpose of the TPR is to identify design features and operation plans that mitigate <br /> or control potentially adverse environmental impacts while providing information <br /> demonstrating on how the Facility complies with state minimum standards. <br /> The operator, Tracy Material Recovery & Solid Waste Transfer, Inc. (Tracy) <br /> seeks to expand the existing permitted operations at the MRF/TS, as allowed by <br /> the Solid Waste Facility Permit, by making the following operational changes that <br /> would be declared to be significant by the California Department of Resources, <br /> Recycling, and Recovery (CalRecycle): <br /> • Increase the tonnage to 1,800 TPD to meet the needs of AB 32 for City of <br /> Tracy and San Joaquin County <br /> • Expand programs to accommodate the AB 341 mandate of providing <br /> commercial recycling to all business and multi-family units <br /> • Expand the outdoor green waste processing operations to allow the <br /> processing of co-collected residential green waste with food waste, to <br /> produce compost feedstock and/or anaerobic digestion feedstock <br /> • Include the processing of commercial food waste inside the MRF/TS <br /> building to produce compost feedstock and/or anaerobic digestion <br /> feedstock <br /> • Add a 1 mega-watt wood waste biomass gasification plant <br /> • Increase the permitted hours of the facility for processing of materials in <br /> the MRF/TS building to 24 hours daily, Monday— Sunday; <br /> The Solid Waste Facility Permit would not be increased with respect to the <br /> currently-permitted hours for receipt of waste at the facility for either the <br /> commercial operations (4:00 A.M. — 6:00 P.M. daily) or public (6:00 A.M. — 4:00 <br /> P.M. daily). <br />