Laserfiche WebLink
v <br />Construction & Demolition/Inert Debris Facility Report <br />Tracy Material Recovery and Transfer Facility <br />30703 S. MacArthur Drive, Tracy, California 95377 <br />Description and Methods to Comply with State Minimum Standards <br />Inert Debris (Type A) Processing Facility <br />Inert Debris (Type A) Storage <br />Inert debris that has been received will be processed within 6 months of receipt. <br />Storage of unprocessed material will not exceed 6 months. <br />Inert debris that has been processed and sorted for resale, or reuse, will not <br />remain on site for more than 18 months. Market products will not be stored for <br />more than 18 months. <br />The total amount of material stored onsite will be limited by design constraints <br />and will not exceed 50,000 cubic yards at any given time. The pre-processed <br />material may accumulate up to 180 -days of inert debris for peak tonnages. Inert <br />debris piles will not exceed 25 feet in height. Please refer to Site Plan in Figures <br />section for storage locations. This amount will not exceed 30,000 cubic yards for <br />pre-processed inert debris and 20,000 cubic yards of processed materials, or a <br />combination thereof. <br />Storage of Inerts <br />Design Capacity <br />Gate Tonnage <br />200 TPD <br />Debris and processed <br />30,000 Tons <br />materials tonnage <br />stored at maximum <br />operations <br />Conversion to cubic <br />30,000 Cubic Yards <br />yards at 2,000 pounds <br />per cubic yard <br />Total on-site Storage <br />30,000 Cubic Yards <br />Mixed C&D Debris Storage <br />Mixed C&D debris that has been received will be processed within 15 days of <br />receipt. Storage of unprocessed material will not exceed 15 days. Mixed C&D <br />debris that has been processed and sorted for resale, or reuse, will not remain on <br />site for more than 1 month. Market products will not be stored for more than 90 <br />days. <br />The total amount of material stored will not exceed 48,000 cubic yards (or 12,000 <br />tons) at any given time. Please refer to Site Plan in Figures section for storage <br />locations. <br />12 170.18 CDI FacReport 050813 revised <br />