Laserfiche WebLink
Construction & Demolition/Inert Debris Facility Report <br />Tracy Material Recovery and Transfer Facility <br />30703 S. Mac4rthur Drive, Tracy, California 95377 <br />Table 11 - Inert (Type A) Inert Processing Equipment <br />Machinery <br />Machinery <br />Permit <br />Ave. <br />Max. <br />Major Brand <br />Production <br />Gate <br />Production <br />Design <br />2 <br />Rate <br />Tonnage <br />Hours/Day <br />Capacity <br />Portable HSI Lippeman <br />15 <br />180 <br />16 <br />240 <br />Milwaukee Jaw Plant, <br />250 <br />2,000 <br />8 <br />3,000 <br />3- deck Cedar Rapid <br />Tons/Hour <br />Tons/Day <br />Hours/Day <br />Tons/Day <br />screen, electric (or <br />30 <br />320 <br />16 <br />480 <br />similar <br />Tons/hour <br />Tons/day <br />Hours/Day <br />Tons/Day <br />Table 12 — Mixed C&D Processing Equipment <br />Machinery <br />Machinery <br />Expected <br />Ave. <br />Max. <br />Major Brand <br />Production <br />Tonnage <br />Production <br />Design <br />2 <br />Rate <br />per Day <br />Hours/Day <br />Capacity <br />Mixed C&D Pre -Sort <br />15 <br />180 <br />16 <br />240 <br />Grappler/Front-End <br />Tons/hour <br />Tons/day <br />Hours/Day <br />Tons/Day <br />Loaders <br />1 1 <br />Mixed C&D Mechanical <br />30 <br />320 <br />16 <br />480 <br />Pick -line <br />Tons/hour <br />Tons/day <br />Hours/Day <br />Tons/Day <br />after Pre - <br />Sort <br />Wood Grinder <br />25 <br />100 <br />16 <br />400 <br />Tons/Hour <br />Tons/da <br />Hours/Da <br />Tons/Da <br />Table 13 - Equipment On -Site <br />Equipment <br />T e <br />Qty. <br />Capacity <br />Front end loaders <br />Major Brand <br />2 <br />Various 3 to 7 cubic ds. <br />Bobcats <br />Major Brand <br />2 <br />Various <br />Excavators <br />Major Brand <br />1 <br />Various bucket sizes <br />Transport Trucks <br />Major Brand <br />5 <br />100 cubic yards <br />Scale System <br />I Major Brand <br />14 <br />1 70 foot <br />Generator <br />I Major Brand <br />1 1 <br />Facility equipment is maintained under a program that focuses on identifying and <br />correcting equipment problems before breakage or failure occurs. This program <br />allows equipment maintenance to be scheduled for weekends or after hours to <br />avoid disruptions to the debris processing operations. The inspection, <br />maintenance, and repair program will be in accordance with the equipment <br />manufacturers' recommendations. <br />• Regular maintenance of vehicles and equipment, including frequent capacity <br />checks and changes of oil and other fluids, tire maintenance, and minor <br />28 170.18 CDI FacReport 050813 revised <br />