My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:46:02 AM
Creation date
7/3/2020 11:17:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_2
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br />Construction & Demolition/Inert Debris Facility Report <br />Tracy Material Recovery and Transfer Facility <br />30703 S. MacArthur Drive, Tracy, California 95377 <br />Material Type <br />Final Disposition <br />Loose dry wall <br />Delivered to agricultural processors or used at <br />onsite compost facility, or added to residual <br />pile if no markets. <br />Plastics <br />Collected and baled at MRF/TS building for <br />delivery to brokers or processors, or added to <br />residuals. <br />Materials Management and Storage <br />Table 19 — Materials Management — Storage and Removal Method <br />Material Type <br />Storage and Removal Method <br />% inch AB specification <br />Stockpile on-site not to exceed 12 months or <br />30,000 cubic yards. Removal via transfer trailer <br />or other vehicle. <br />3/8 inch utility sand <br />Stockpile on-site not to exceed 12 months or <br />10,000 cubic yards. Removal via transfer trailer <br />or other vehicle. <br />Scrap Metal <br />Stockpile or two 40-cyd bin storage on-site for <br />floor sorting, and at least two bins or a bunker <br />will be placed under Processing Line once <br />installed. One bin next to Inert Processing Area <br />and the other next to the C&D Operations Pad. <br />Tracy MRF & TS to arrange transfer and <br />delivery to local metal broker for further <br />processing and baling, within 7 days of <br />processing. As tonnages increase, a transfer <br />trailer will be used. Storage will not exceed <br />1,000 tons. <br />Wood <br />Wood debris stockpiled on perimeter of C&D <br />Processing Area during floor sorting. At least <br />two 40-cyd bins or a bunker will be placed <br />under Processing Line once installed. Tracy <br />MRF & TS to grind onsite or arrange transfer <br />and delivery to local organic processor for <br />grinding within 30 days of processing. As <br />tonnages increase, a transfer trailer will be used <br />to transfer wood chips. Chipped wood will be <br />removed within 30 days of grinding. Removal <br />will be via transfer trailer or other vehicle. <br />34 170.18 CDI FacReport 050813 revised <br />
The URL can be used to link to this page
Your browser does not support the video tag.