Laserfiche WebLink
Part 3. FACILITY INFORMATION <br />A. PROPOSED CHANGE (Check applicable box(es)): <br />a1. DESIGN (describe): Add biomass gasifier, add C&D Processin <br />increase design capacl . <br />add aeration equipment for <br />Increase daily tonnage to 1,800 TPD; expand C&D operations area and capacity; increase <br />public materials receipt hours; increase Inert Debris processing area; increase hours for <br />UX2. OPERATION (desmrbe): processing: increase traffic volume: add food waste to composting feedstocks. <br />❑3. OWNER, OPERATOR, ADDRESS, AND(OR FACILITY NAME CHANGE (describe): n/a <br />n4. OTHER (describe): n1a <br />B. FACILITY INFORMATION: <br />1. INFORMATION APPLICABLE TO ALL FACILITIES: <br />a. PEAK DAILY TONNAGE OR CUBIC YARDS 1,800 TPD (MSW), 1,038 Tons per week (composting) <br />1) DISPOSALITRANSFER (unit) 1,800 TPD <br />2) OTHER (unit) n/a <br />b. DAILY DESIGN TONNAGE (TPD) <br />c. FACILITY SIZE (acres) <br />TPD <br />51.7 <br />d. PEAK TRAFFIC VOLUME PER DAY (vpd) 1,245 VPD <br />Hours for Receipt of Materials: Commercial, 4 AM to 6 PM/Monday-Saturday; Self haul, 6 <br />AM to 6 PM/Monday-Saturday. Processing hours: Indoors - 24 hours/Monday-Sunday, <br />Outdoors - 6 AM to 10 PM/Monday-Sunday. Maintenance Hours: 24 hours/Monday-Sunday. <br />e. DAYS AND HOURS OF OPERATION <br />2. ADDITIONAL INFO. REQUIRED FOR COMPOSTING FACILITIES ONLY: <br />a. SITE STORAGE CAPACITY (cu yds) 49,200 cu. yds. <br />3. ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br />a. AVERAGE DAILY TONNAGE (TPD) n/a <br />b. SITE CAPACITY CURRENTLY PERMITTED (Airspace) (cu yds) <br />c. SITE CAPACITY PROPOSED (Airspace) (cu yds) <br />d. SITE CAPACITY USED TO DATE (Airspace) (cu yds) <br />e. SITE CAPACITY REMAINING (Airspace) (cu yds) <br />I, DATE OF CAPACITY INFORMATION (Date) (See instructions): <br />g. LAST PHYSICAL SITE SURVEY (Date) n1a <br />h. ESTIMATED CLOSURE DATE (month and year) <br />1. DISPOSAL FOOTPRINT (acres) h/a <br />n/a <br />n1a <br />n/a <br />n/a <br />n1a <br />n1a <br />j. SITE CAPACITY PLANNED (cu yds) n/a <br />k. 1. (1) IN-PLACE WASTE DENSITY (Ibs of waste per cu yd of waste) <br />AND <br />(ii) WASTE -TO -COVER RATIO (Estimated) (v:v) n/a <br />OR <br />2. AIRSPACE UTILIZATION FACTOR (tons of waste per cu yd of landfill airspace) n/a <br />Part 4. SOURCE OF WATER SUPPLY (Check applicable boxes) <br />n/a <br />F_JA. MUNICIPAL OR UTILITY SERVICE: <br />XXB.INDIVIDUAL (Wells): All water for facility operations, including potable water will be obtained from an on site <br />supply well. <br />. ❑C. SURFACE SUPPLY: <br />1. NAME OF STREAM, LAKE, ETC.: <br />2. TYPE OF WATER RIGHTS: <br />QRIPARIAN ❑APPROPRIATION <br />3. STATE PERMIT OR LICENSE NUMBER, IF APPLICABLE: <br />Page 2 <br />