Laserfiche WebLink
Item No. 2 <br /> PC; 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 4 <br /> to actual Final EIR publication. <br /> DETERMINATION OF ADEQUACY OF THE FINAL EIR; <br /> The only determination to be.made by the Commission in order to certify the EIR is whether or not it is <br /> adequate as described in section 151 s1 of the CEQA Guidelines, This section states.in partthat'an EIR <br /> should be prepares with a sufficient degree of analysis to provide decision makers with information which <br /> enables them to make•a decision which irttetli e <br /> evaluation of the envrronmenial effects of a Proposed-p <br /> rojectp of-a coed not.unt environmental-consequences. An <br /> Of an EIR.is to be revieweiv <br /> d in-the light of what is reasonably feasible,' ft is staffs determinatioe*�Ibut the n that the <br /> EIR meets the intent of this section. The document thoroughly discusses all issues presented in the <br /> Notice of Preparation, contains all sections required by law,and adheres to all review •Periods and <br /> requirements. All issues raised during the review of the time <br /> Final EIR. draft document are thoroughly discussed in the <br />