Laserfiche WebLink
Item No, 2 <br /> PC: 12-16-93 <br /> ER-93-1/U P-93-4 F <br /> Page 17 <br /> Construction of fills,foundations,slabs, and roadways <br /> with the geotechnical recommendations contained in Appendix F oft e F nalcEIR�ance <br /> C.4. PoteMIMI Si nificant lrn act: Construction of the ro osed ro ect fa <br /> surface soil erosion, cilities would rornote <br /> Finding-. <br /> Changes 1 or alterations have been required in, or incorporated into, the Project which avoid or <br /> substantially lessen the significant environmental effect as identified in the Final EIR. <br /> Statement of Fact•. <br /> This impact will be reduced by the following:. <br /> ° Place plastic sheeting, debris fences, sift fenc <br /> • � and/or hay bales to protect disturbed <br /> surfaces during storms Burin <br /> g construcon. <br /> surfaces, especially slopes, shall be rev getated.Following construction, all disturbed <br /> D_ WATER RESOURCES <br /> D.1. Potential Si nificant Impact: Surface water contamination ma occur r <br /> waters or storm waters that have become contaminated, from dischar a of surface <br /> Fin---ding . <br /> Changes or alterations have been required in, or incorporated into, the project <br /> ch avoid or <br /> substantially lessen the significant.environmental effect as identified in the Final EIR <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> Construct on-site drainage, as proposed. <br /> ' The evaporation/collection pond for surface runoff from the active workin area <br /> and wood waste area) shall be lined. 9 (the yard <br /> All surface areas involved in the transportation, processing, or storage of wastes <br /> paved or lined and drained to an a shall be <br /> appropriate catchment facility to prevent contaminated <br /> • runoff from entering the surface and ground water. <br /> The proposed receiving and processing operations shall take place within covered and <br /> Paved structures. The outdoor wood and yard waste composting area shat)be paved or <br /> lined. Except for yard and wood waste,there shall be no direct precipitation onto wastes <br /> and no contamination of surface water. All buildings shall be constructed so that storm <br /> runoff shall not enter and come into contact with waste or recovered materials. <br />