My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:46:02 AM
Creation date
7/3/2020 11:17:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_2
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No, 2 <br /> PC: 12-16-93 <br /> ER-93-1/U P-93-4 F <br /> Page 17 <br /> Construction of fills,foundations,slabs, and roadways <br /> with the geotechnical recommendations contained in Appendix F oft e F nalcEIR�ance <br /> C.4. PoteMIMI Si nificant lrn act: Construction of the ro osed ro ect fa <br /> surface soil erosion, cilities would rornote <br /> Finding-. <br /> Changes 1 or alterations have been required in, or incorporated into, the Project which avoid or <br /> substantially lessen the significant environmental effect as identified in the Final EIR. <br /> Statement of Fact•. <br /> This impact will be reduced by the following:. <br /> ° Place plastic sheeting, debris fences, sift fenc <br /> • � and/or hay bales to protect disturbed <br /> surfaces during storms Burin <br /> g construcon. <br /> surfaces, especially slopes, shall be rev getated.Following construction, all disturbed <br /> D_ WATER RESOURCES <br /> D.1. Potential Si nificant Impact: Surface water contamination ma occur r <br /> waters or storm waters that have become contaminated, from dischar a of surface <br /> Fin---ding . <br /> Changes or alterations have been required in, or incorporated into, the project <br /> ch avoid or <br /> substantially lessen the significant.environmental effect as identified in the Final EIR <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> Construct on-site drainage, as proposed. <br /> ' The evaporation/collection pond for surface runoff from the active workin area <br /> and wood waste area) shall be lined. 9 (the yard <br /> All surface areas involved in the transportation, processing, or storage of wastes <br /> paved or lined and drained to an a shall be <br /> appropriate catchment facility to prevent contaminated <br /> • runoff from entering the surface and ground water. <br /> The proposed receiving and processing operations shall take place within covered and <br /> Paved structures. The outdoor wood and yard waste composting area shat)be paved or <br /> lined. Except for yard and wood waste,there shall be no direct precipitation onto wastes <br /> and no contamination of surface water. All buildings shall be constructed so that storm <br /> runoff shall not enter and come into contact with waste or recovered materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.