Laserfiche WebLink
copy . <br /> GENERAL, CONSIDERATIONS: <br /> 1. Does it appear that 'any environmental* feature of the project <br /> Vill generate significant public concern or controversy? f <br /> ( ) Yes (X) No Nature of concern(s) <br /> 2. Will the prvj ect require approval or permits by agencies other <br /> than the County? CK) Yes ( ) No <br /> Agency name(s) <br /> 3 : Is theproject within the Sphere of Influence, or within two <br /> miles of any city? <br /> ( ) Yes (X) No City: A4, <br /> EMYVIRONMENTAL IMPACTS: - <br /> "Yes" may only be checked in situations where there is substantial evidence to . <br /> indicate that .there may be a significant adverse impact on the environment if <br /> there i no change in the project description. (C�'QA Guidelines,. 5ec_ ,?5064) <br /> See the "Di.gcussion" section at the end of the Initzal Study for explanation of <br /> any impacts checked "Yes", or any "No" answer mar'sed with an asterisk <br /> Sources. The following sources of information have been used in determining <br /> environmental impacts: <br /> Original 'Source materials and maps an file in the Community Develonaient <br /> Department including: all County and City general plans and community plans; <br /> assessor parcel books; various local and F-714A flood zone mans; service district <br /> maps; maps of geologic instabLl.t_r; maps and reports on endangered species such <br /> As the Natural Diversity Data.Base; noise contour maps; svecific roadway plans; <br /> mans and/or records of archealogical/historic resources; soil reports and maps; <br /> etc_ Hang of these original source materials have -been callected from at-her <br /> public agencies or from previously prepared M:t,.s and other technical studies. <br /> Additional standard sources which should be spec-ifically cited below include <br /> On-site visits by staff (note date); staff 3mowledge or experience; and . <br /> independent env4-onmental studies submitted to the Count as na_*r of the oroj and <br /> avplicat°on (note report titlect <br /> e, date, and consultant) . <br /> I �m_-_R Yrs NO <br /> a•. is any pez-tion of the nroject <br /> s- bjec* to flood hazard? x <br /> Flood zone G <br /> Initial Studer (Rev-:0;/91) <br /> 2 <br />