My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 8:46:02 AM
Creation date
7/3/2020 11:17:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_2
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRACY MATERIAL RECOVERY AND TRANSFER STATION <br /> TRAFFIC SUMMARY <br /> for <br /> 1800 tons per day(peak),6 day per week,typical operation <br /> • VENDORS& RESIDENTIAL COMMERCIAL SELF-HAUL OUTBOUND TOTAL <br /> TIME EMPLOYEES VISITORS COLLECTION COLLECTION WASTE LOADS LOADS TRAFFIC <br /> In Out In Out In Out In Out In Out In Out In Out <br /> 12:00-0:59 AM 0 0 <br /> 1:00-1:59 AM 0 0 <br /> 2:00-2:59 AM 0 0 <br /> 3:00-3:59 AM 50 50 0 <br /> 4:00-4:59 AM 15 26 5 33 5 74 <br /> 5:00-5:59 AM 20 13 13 33 13 <br /> 6:00-6:59 AM 6 20 20 36 36 4 7 66 63 <br /> 7:00-7:59 AM 19 19 19 24 24 43 43 7 11 112 97 <br /> 8:00-8:59 AM 1 1 6 6 24 24 43 43 16 16 90 90 <br /> 9:00-9:59 PM 1 1 25 25 50 50 16 16 92 92 <br /> 10:00-10:59 PM 1 1 19 19 24 24 65 65 16 16 125 125 <br /> 11:00-11:59 PM 15 1 1 6 6 24 24 65 65 16 16 127 112 <br /> 12:00-12:59 PM 17 1 1 20 20 65 65 15 15 101 118 <br /> 1:00-1:59 PM 7 2 2 19 14 17 17 56 56 15 15 109 111 <br /> 2:00-2:59 PM 2 2 6 6 15 15 56 56 15 15 94 94 <br /> 3:00-3:59 PM 1 1 25 14 56 56 12 12 94 83 <br /> 4:00-4:59 PM 15 1 1 21 17 45 45 4 88 61 <br /> 5:00-5:59 PM 42 1 1 40 40 3 44 83 <br /> 6:00-6:59 PM 6 0 6 <br /> 7:00-7:59 PM 15 8 15 8 <br /> 8:00-8:59 PM 15 0 15 <br /> 9:00-9:59 PM 0 0 <br /> 10:00.10:59 PM 0 0 <br /> • 11:00-11:59 PM 0 0 <br /> TOTALS 125 125 12 12 96 96 253 253 620 620 139 139 1245 1245 <br /> Peak Hours <br /> NOTES: <br /> 1. All values shown are estimates of peak traffic volumes and loads. Actual traffic and load values may vary. <br /> 2. Total number of employees is 160. <br /> CALCULATIONS: <br /> 1. Total loads of residential materials brought to facility= 96 <br /> 2. Total tons of residential materials brought to facility= 554 <br /> 3. Total bads of Commercial materials brought to facility = 253 <br /> 4. Total tons of Commercial materials brought to facility = 874 <br /> 5. Total self-haul loads of materials brought to facility= 620 <br /> 6. Total tons of self haul materials brought to facility = 372 <br /> 7. Total loads of materials brought to the facility each day from all sources= 969 <br /> 8. Total tons brought to the facility each day from all sources= 1800 <br /> 9. Total loads of materials removed from the facility each day= 139 <br /> 10. Total tons of materials removed from the facility each day= 1738 <br /> 1800 TPD Traffic Distribution <br /> 9/13/2010 170.18.01 Tonnage-Traffic Estimates Sell haul 6-6 091310.x1s <br />
The URL can be used to link to this page
Your browser does not support the video tag.