My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOWMAN
>
944
>
4400 - Solid Waste Program
>
PR0400042
>
COMPLIANCE INFO_1993-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2024 10:28:20 AM
Creation date
7/3/2020 11:18:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-2008
RECORD_ID
PR0400042
PE
4452
FACILITY_ID
FA0000120
FACILITY_NAME
OLIVERA FOOD INC
STREET_NUMBER
944
STREET_NAME
BOWMAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19128019
CURRENT_STATUS
01
SITE_LOCATION
944 BOWMAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4452_PR0400042_944 BOWMAN_1993-2008.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 a <br />San Joaquin ounty <br />DIRECTOR <br />Environmental Health Department <br />Donna Heran, REHS <br />ASSISTANT DIRECTOR <br />600 East Main Street <br />Laurie Cotulla, REHS <br />Stockton, California 95202-3029 <br />PROGRAM COORDINATORS <br />Carl Borgman, REHS <br />Website: .SJ ov.Org/ehd <br />Mike Huggins, REHS, RDI <br />Margaret Lagorio, REHS <br />Phone: (209) 468-3420 <br />Robert McClellon, REHS <br />Fax: (209) 464-0138 <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />CONTINUATION FORM <br />December 7, 2007 <br />Olivera Egg Ranch <br />Edward F. Olivera <br />P.O. Box 32126 <br />San Jose, CA 95152 <br />On December 7, 2007 the Environmental Health Department (EHD) conducted a routine <br />inspection at the facility located 944 Bowman Road, French Camp, CA. The facility was found to <br />be in compliance with it's current Manure Management Plan (MMP). The following areas of <br />concern were noted during the inspection. <br />1. The facility is currently constructing a new layer house in the location where house 14 <br />used to be. The construction of the new layer house requires that t The MMP be revise <br />to reflect the changes. <br />2. The facility is currently in the process of remodeling house 6 to be used as a cage free <br />laying operation, The addition of the cage free operation will require that the MMP be <br />revised to reflect the changes. <br />Revise the MMP and provide the EHD with a copy for review at least 20 days prior to <br />operation of the new houses, or no later than January 15, 2008. <br />MAILED TO OWNER <br />Robert McClellon, Program Coordinator REHS <br />Environmental Health Department <br />Cc: John den Dulk, Ripon Milling <br />
The URL can be used to link to this page
Your browser does not support the video tag.