Laserfiche WebLink
1 <br /> • t <br /> N EWS <br /> Flood Control System <br /> offers State—of.-the-Art <br /> protection <br /> Environmental <br /> 1 the design of the site <br /> O'Day Consultants of Carlbsbad, Calif., ,s move to its new facility on <br /> development plans for the San Diego Auto Auction <br /> 39.5 acres at Calle Montecito,Calif. <br /> Of the parcel, S3 acres along the river have been dedicated to the City of <br /> The area,designed by O'Day,has a riverside <br /> Oceanside forflood control Purposes- <br /> do g from the anticipated <br /> pond holding area to alleviate possible <br /> 100-year-storm. River and the new federal <br /> The property's location near therequireniSan Luis elements in the project's <br /> � regarding stormwater run-off were key <br /> design,according to Patrick N.O'Day,P.E.,the 's owner. <br /> The design includes an intricate drainage <br /> system Manus.tormwuerrun-offfrom <br /> STORM WATER RWOFF _ <br /> STORM ORM <br /> NZ <br /> SEPARATOR POW <br /> PIPE FLOW , _ RPE FLOW <br /> OIL ABSORSEM 0GOAL AND OF <br /> PILLOWS YK=46lT of <br /> Y FOK <br /> p�p M01 T�SLRM1I� <br /> OUT oF COURSE S000ff - <br /> NERVIEW <br /> sa.ww r <br /> .cummow <br /> �sr•.m. <br /> process allows run-off to be collected in the <br /> the property.The two-step p for that will separate oil and <br /> on-site storm drain sYsum then deposited in an interceptor tllows" <br /> water. Oil from the storm run-off is removed y absorption using "p <br /> designed specifically for this purpose. <br /> The treated water is discharged into a 110 foot long grass-lined ditch,which <br /> collects any residual materials. magnitude," <br /> "It's one thing to anticipate the technical is of a project of thiproject <br /> "It's another thing to negotiate a permitting process. <br /> says O'Day'. of Oceanside,the California Department <br /> required permit approvals from the City enc Manage- <br /> ment <br /> the Federal Emergency g - <br /> ofFish and Game,the Army Corps of Engin Control Board. <br /> merit Administration,and the San Diego Regional Water Quality etorin floodwater <br /> The U.S. Army Corps of Engineers is designing leents. <br /> control project for the river which the O'Day Site design compm <br />