Laserfiche WebLink
JAN-24-2008 16:45 From: ® 0 To: 6421138 P.2/4 <br /> January 22, 2008 <br /> This letter is in response to questions regarding a Service Request for review of <br /> the Solid Wastc Program Plan. <br /> 1. "The plans submitted do not include type of finish on walls within kennel. <br /> Submit plans to include type of easily cleanable finish will be on walls within <br /> kennel." <br /> Official plans indicate that the specifics of the wall finishes are to be provided by <br /> owner. <br /> inside the actual dog runs/cages,the wails will be finished with green board <br /> drywall, Kitchen grade laminate will then be placed on top of the drywall and sealed to <br /> create a water-tight and chew resistant finish. <br /> All walls outside of the actual dog runs/cages will be finished with regular <br /> drywall and painted with washable, latex paint. <br /> 2. "The plans submitted include a residential septic system in place, but lack an <br /> acceptable commercial septic system for waste water disposal from the <br /> kennel. Submit plans to include a map of an acceptable commercial waste <br /> water disposal system." <br /> Please see attached. <br /> 3. Flooring specifications and grading. <br /> Please see attached. <br />