Laserfiche WebLink
January 31, 2008 <br /> This letter is in response to questions regarding a Service Request for review of <br /> the Solid Waste Program Plan. <br /> 1. "The plans submitted do not include type of finish on walls within kennel. <br /> Submit plans to include type of easily cleanable finish will be on wills within <br /> kennel." <br /> Official plans indicate that the specifics of the wall finishes are to be provided by <br /> owner. <br /> Inside the actual dog runs/cages,the walls will be finished with green board <br /> drywall. Kitchen grade laminate will then be placed on top of the drywall and all seams <br /> will be sealed with silicone caulking. There will be a 4(four)inch coving composed of <br /> quarry tile, grouted with commercial grade grout to keep any water from going up into <br /> the wall. <br /> All walls outside of the actual dog runs/cages will be finished with regular <br /> drywall and painted with washable,latex paint. <br /> 2. "The plans submitted include a residential septic system in place,but lack an <br /> acceptable commercial septic system for waste water disposal from the <br /> kennel. Submit pians to include a map of an acceptable commercial waste <br /> water disposal system." <br /> Ptcasc see attached. <br /> 3. Flooring specifications and grading. <br /> Please see attached. <br />