My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORREIA
>
0
>
4400 - Solid Waste Program
>
PR0440077
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2020 1:40:44 PM
Creation date
7/3/2020 11:19:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0440077
PE
4461
FACILITY_ID
FA0000593
FACILITY_NAME
CORREIA FARMS/SHIELDS NATL INC
STREET_NUMBER
0
STREET_NAME
CORREIA
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
CORREIA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
CField
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4461_PR0440077_0 CORREIA_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/24:92 17:08 $0707 578 666 WADHAM ENERGY 601 <br />®M al �nie.ni <br /> SEF' 24 192 2e:58 0EC/WADHMM-ENEGY_(916)473-2833 P.12 <br /> ASH UNLOADING PROCEDURE AT OEC <br /> NOTE: Hard hate and safety glasses are required at all times <br /> awhile on site. <br /> 1 . Weigh on scales. Follow written instructions in scale <br /> house. Record tare. <br /> 2. Check in at control room for any special instructions. <br /> 3 . Proceed to ash silo while observing all coigns, warnings* <br /> and traffic conditions. <br /> 4. Inspect all equipment utilized in ash loading process <br /> (loading station, ash drum, safety guards, ash drum <br /> trunnions and chains etc. ) to determine condition at start <br /> of loading. Report any abnormal conditions to control <br /> room. <br /> 5. <br /> Clean equipment on upper deck if necessary. <br /> Proceed with loading: <br /> a) Press power On Button <br /> b) Start Ash Drum First <br /> c) Set Water Flow 6 28 GPW <br /> d) Start Rotary Valve <br /> 7. Load truck while being observant of surroundings and truck <br /> capacity. <br /> 8. Conclude Loading: <br /> a) Secure Rotary Valve <br /> b) Leaving Drum and Water Oji <br /> c) Secure water when all ash is removed from drum and <br /> clear water is coming out of the drum. <br /> d) Secure ash drum. <br /> e) Remove 4" Pipe O&P at south aids, discharge of rotary <br /> valve. Clean with water. <br /> f) Clean work area. <br /> 9. Pull trailer from under ash silo enough to tarpon <br /> "cordance with proper trucking codes and safety practices. <br /> 10. Check out at control room. Report any aibhormal conditions. <br /> 11. Weigh on scale%. Follow written instructions in scale <br /> houses. <br /> . ., <br /> Rost-it-brand fax transmittal memo 7671 «at ► <br /> 71s F.aan <br /> III <br /> cx. <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.