Laserfiche WebLink
F 131 3779646 ` P. 13 <br /> AT'ACHMENT 7 Z7-6 - <br /> OLst Control: <br /> As,' wily not be spread when wind velocity could cause dust. Proposed spreading <br /> methods do not generate dust. <br /> ET v. s y <br /> 'ET:. <br /> Asi will not be stored where wind can move the ash off-site or into surface <br /> water. -� <br /> Rini-off Control : <br /> Thi ash will be incorporated immediately after spreading to prevent movement off <br /> the target field. <br /> Ms .j A11 rtin-off is impounded on property. c7 eS <br /> Soil permeability is favorable and should help prevent run-off: <br /> k. St-,pe is flat. rte` <br /> `Y <br /> " p <br /> i <br />