Laserfiche WebLink
A <br /> APPENDIX B <br /> . DURATION OF DISPOSAL: <br /> EACH YEAR INCOMING TE—F'RO DUCT IS RECEIVED AT THE SITE FROM JUNE <br /> TH U MID OCTOBER AC:H YEAR. <br /> 2. TYPE OF DISPOSAL `SITE SECURITY <br /> -------------------------------- <br /> EARTH BERM AND WIRE F E CE WITH TWO RESTRICTED ACCESS OPENINGS, POSTED <br /> WITH WARNING SIGNS, TO PREVENT PUBLIC ENTRY. THIS SITE SHALL HAVE AT <br /> LEAST ONE RESPONSIBLE PERSON N U PREM I SES TO PROVIDE SECURITY 24 HOURS <br /> A DAY DURING DI PO AL. DURATION. <br /> . TYPE OF WASTE RECE,IVED AT SITE <br /> ------------ <br /> TOMATOES,, VINES, PEAL HES,MUD,; APRICOTS ETC. <br /> . ESTIMATED TOTAL. QUANTITY RECEIVED AT SITE <br /> ------------- <br /> APPROXIMATELY 100 TONS OF PRODUCT ; RE RECEIVEDT THE SITE <br /> EACH HOUR DAY THE CULL MATERIAL. I ', APPLIED IN A CYCLIC FASHION <br /> OVER THE 32 ACRE SITE. THE FATE OF APPLICATION IS TEN WET TCDD - TO THE <br /> ACRE ONE, TQ THREE INCHES THICK. <br /> . WORK PLAN FOR APPLYING WANE TO LAND <br /> --------------------------------------- <br /> C:UL.L MATERIALS ARE UTILIZED FOR NITROGEN~'OGE# AND SOIL -ENRICHMENT BY MEANS <br /> OF A SPREAD AND DISC ,€ PE AT I ON, UNDER WHICH MATERIALS ARE PROCESSED <br /> IN-1-0 THE OIL. ONCE ID :Y.. (SEE ZDIAGRA 1 AS ID ) d INCOMING TRUC, SPREAD <br /> MATERIAL ONE TO THREE I NC~HEE TQ PROMOTE DRYING AND WITHIN 24 HOURS. <br /> MATERIAL IS SPR I NGTU THEID TO FURTHER ENHANCE THE DRYING PROCESS. THIS <br /> PROCEDURE IS REPEATED UNTIL_ ID Y I HCS. I , C OMPL.ETE. AND THEN MATERIAL. I <br /> FINALLY IDI CEID INTO SOIL. <br />