Laserfiche WebLink
WORT: PLAN <br /> Y 0 4 1992 <br /> CANNERY WASTE IS TRUCKED TO THE SITE, DUMPED AND EVLE Eq <br /> IT IS ALLOWED TO DRY AND INCORPORATED INTO O THE SOIL. FINYWACES <br /> BENEFITS THE SOIL THROUGH THE DECOMPOSITION OF ORGANIC MATTER AND <br /> LEADS TO FORMATION OF HUMUS WHICH INCREASES THE SOILS CAPACITY TO <br /> )=PROMOTE PLANT PRODUCTION. THE DERIVED ORGANIC MATTER ALSO <br /> PROMO"T"ES A MORE FAVORABLE SOIL STRUCTURE. <br /> MONITORING OF THE FACILITY WILL INCLUDE DAILY RECORD OF LOADS <br /> RECEIVED, LOCATION OF DISPOSAL AREA, LOC OF UNUSUAL <br /> OCCURRENCES, REMOVAL OF EXTRANEOUS MATERIAL & SAMPLES OF SOIL <br /> BEFORE AND AFTER OPERATION. ! ANALYSIS WILL INDICATE A RANGE OF <br /> TOTAL NITROGEN CONTENT FROM: G% BY DRY WEIGHT FOR SOME FRUIT <br /> . WASTES TO 3. 2% BY DRY WEIGHT FOR SOME TOMATO WASTES. <br /> THE SPREAD AND DISC OPERATION FOR RETURNING AGRICULTURE RESIDUALS <br /> 1-0 SOILS IS NOW A WIDELYACCEPTED PRACTICE. THE QUANTITY OF <br /> MATERIALS HANDLED AT A SITE USED EXCLUSIVELY FOR FOOD PROCESSING <br /> RESIDUALS REQUIRES SPECIAL ATTENTION AND EQUIPMENT TO PRECLUDE <br /> CREATION OF NUISANCE CONDITIONS. <br /> THE TRUCKS WILL DUMP IN ROWS.. THESE ROWS WILL Lei:._ E3PACED ::C)" nPAr?.T <br /> AND ASSISTED BY MARKERS. THE WASTE IS SPREAD TO 14 DEPTH, AND <br /> ALLOWED TO AIR DRY FOR 12 HOURS. AT THE END OF 12 HOURS, <br /> REI='EATED PASSES ARE MADE OVER THE MATERIAL USING A SPRING TOOTH <br /> C::ULTIVATOR. THE PURPOSE IS TO EXPOSE WET MATERIALS TO ENHANCE <br /> SOLAR EVAPORATION. THIS PROCESS IS REPEATED EVERY 12 HOURS. THE <br /> SPRING TOOTH CULTIVATION SHATTERS THE DRY CRUSTS FORMED BY DRYING <br /> WET WASTE MATERIALS AND AND EXPOSING MORE SURFACE AREA FOR <br /> DRYING. THIS SHATTERING AND EXPOSING INCREASES DRYING OF <br /> MATERIAL FROM 0 TO 4 DAYS. <br /> A FOUR !r!! lL.EL FARM TRACTOfti WILL 1:(E PULLING A 122 WIDE DRAG <br /> .SCRAPPER. WHICH WILL BE SPREADING THE WET WASTE. EVERY 12 HOURS <br /> THE LOADS WILL BE SPRING TOOTHED. WITHIN O DAYS TOTAL <br /> EVAPORATION WILL OCCUR. THE PROCEDURAL SCHEDULE !"'TAS BEEN <br /> DESIGNED TO INTERRUPT THE NORMAL CYCLE FOR FLY DEVELOPMENT. <br />