Laserfiche WebLink
Estimate the volume hauled during a "wet"year <br /> Use the maximum net from page 1. <br /> folume of runoff for January, Frua , March and December 913,235 cu.feet <br /> 6,830,998 gallons <br /> Less the storage volume 2,533,547 gallons — <br /> Volume hauled 4,297,451 gallons <br /> Volume of stormwater sedimentation pond for Area A and B <br /> Area= 16.76 acres <br /> Precipitation depth= 2.28 inches <br /> Sedimentation pond volume= 138,712 cu. feet <br /> 1,037,569 gallons <br /> Total pond volume 31571,116 1 gallons <br /> Case Ill--Assume the entire site is drained to retention pond sized for 24-hour,25-year event <br /> Assume all runoff collected in excess of the retention pond is hauled to the Stockton wastewater <br /> treatment plant. <br /> Area= 33.23 acres <br /> Precipitation depth= 2.28 inches <br /> 'edimentation pond volume= 275,025 cu.feet <br /> 2,057,185 gallons <br /> Volume of runoff (from Case 1) 13,782,275 gallons <br /> Less the storage volume 2,057,185 gallons <br /> Volume hauled 11,725,089 gallons <br /> Summary <br /> Retention Volume <br /> Basin Hauled in <br /> Volume Wet Year <br /> (gallons) (gallons) <br /> Case 1 5,111,703 8,670,571 <br /> Case II 3,571,116 4,297,451 <br /> Case III 2,057,185 11,725,089 <br /> FN: dtr/a:\WATERBAL.XLS Page 3 of 5 Printed: 8/31/94 3:46 PM <br />