Laserfiche WebLink
SMVTCivil EnvironmentalMAP 3 aJ 2009 <br /> 4� ENVIR01,91,,".17N] �iEAUIH <br /> March 27, 2009 <br /> Robert McClellon, REHS <br /> County of San Joaquin <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton, California 95202-3029 <br /> RE: FORWARD COMPOST FACILITY(SWIS NO. 39-AA-0020) <br /> SOLID WASTE FACILITY PERMIT APPLICATION PACKAGE AND <br /> REPORT OF COMPOSTING SITE INFORMATION (DATED MARCH 2009) <br /> Dear Mr. McClellon: <br /> On behalf of Forward Incorporated, SWT Engineering is pleased to submit two (2) copies <br /> each of the Solid Waste Facility Permit (SWFP) application package and the Report of <br /> Composting Site Information (RCSI)for the Forward Compost Facility. This RCSI has been <br /> prepared to meet the requirements of the California Code of Regulations, Title 14 (14 CCR), <br /> Section 18227. In addition, a SWFP application package has been prepared in accordance <br /> with 27 CCR, Section 21570. This submittal includes two (2) copies of the following items: <br /> 1. The completed/signed SWFP application form (Attachment 1). <br /> 2. The RCSI, dated 2009 (provided in its entirety), has been updated to reflect <br /> current design and operational information on compost activities and revised <br /> feedstock information. This RCSI also includes updated figures and appendices, <br /> as appropriate. The updated RCSI provides information on the compost activities <br /> that will be re-instated at the Forward Compost Facility. The RCSI is included as <br /> Attachment 2 (as separate document). <br /> 3. California Environmental Quality Act (CEQA) Compliance Information - An <br /> Environmental Impact Report (EIR), dated December 2002, was filed with the <br /> State Clearinghouse (SCH# 2001052081) and certified by the San Joaquin County <br /> Planning Commission in February 2003. A Notice of Determination (NOD) was <br /> filed with the State Clearinghouse in June 2003. This information is discussed as <br /> Attachment 3. <br /> 4. CEQA Mitigation Monitoring Implementation Schedule - The Mitigation Monitoring <br /> Implementation Schedule is included as part of the December 2002 EIR. This <br /> information is discussed as Attachment 4. <br /> 268 North Lincoln Avenue,Suite 1,Corona,CA 92882• (V)951-736-1010•(F)951-736-1919 <br /> Z:\PROIECTS\Al lied Waste\Forward\Resource Recovery Facility\Permitting Services\2009 SWFP App Pkg\Letter to LEA.doc <br />