My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 12:45:22 AM
Creation date
7/3/2020 11:19:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Blanket cover approximately 1-foot deep. <br /> • Overall pile height is approximately 8 feet. <br /> • Composting period is projected to be approximately 4 to 12 weeks depending on <br /> product desired. <br /> • Aeration fan is approximately 400 cfm per compost cell. <br /> • Biofilter sized for 3 cfm/ft2. <br /> • 40 percent volume reduction after composting. <br /> Alternative 4. Aerated Static Pile/Windrow <br /> This alternative utilizes a combination of two separate composting technologies, aerated <br /> static piles and compost windrows using a windrow turning machine. The combined <br /> maximum daily load capacity for both composting facilities is 1,000 TPD. <br /> The maximum daily load capacity of the aerated static pile compost <br /> facility is 300 TPD. This capacity is based on the following assumptions: <br /> • Six-day per week operations. <br /> • Up to approximately 5 acres for composting piles. <br /> • Extended aeration aerated static pile with individual compost cells approximately 15 <br /> feet wide at the base and 75 feet long. <br /> • Base depth approximately 1-foot deep. <br /> • Blanket cover approximately 1-foot deep. <br /> • Overall pile height is approximately 8 feet. <br /> • Composting period is projected to be approximately 4 to 12 weeks depending on <br /> product desired. <br /> • Aeration fan is approximately 400 cfm per compost cell. <br /> • Biofilter sized for 3 cfm/ft2. <br /> • 40 percent volume reduction after composting. <br /> The maximum daily load capacity of the Windrow compost facility is approximately <br /> 700 TPD. This capacity is based on the following assumptions: <br /> • Six-day per week operations. <br /> • Up to approximately 8 acres for compost Windrows. <br /> Forward Composting Facility <br /> Z:\PROIECTS\Allied Waste\Forward\Resource Recovery Facility\Permitting Services\2009 RCSI\RCSI Final 031609.doc; <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.