Laserfiche WebLink
Method. <br /> 8. ASTM D6495 - Standard Guide for Acceptance Testing Requirements for <br /> Geosynthetic Clay Liners <br /> 9. ASTM D5890 — Standard Test Method for Swell Index of Clay Mineral <br /> Component of Geosynthetic Clay Lines. <br /> 10. ASTM D5891 — Standard Test Method for Fluid Loss of Clay Component <br /> of Geosynthetic Clay Liners. <br /> B. Geosynthetics Institute (formerly Geosynthetics Research Institute [GRI]) Test <br /> Method: <br /> 1. GM 12, Measurement of the Asperity Height of Textured Geomembranes <br /> Using a Depth Gauge. <br /> 1.3 SUBMITTALS AND NOTIFICATIONS <br /> A. Prior to shipment of the GCL, the GEOSYNTHETICS CONTRACTOR shall <br /> provide the QA/QC CONSULTANT with a notarized certificate signed by an <br /> authorized representative of the Manufacturer stating that the product supplied <br /> meets the properties specified in this Section. <br /> B. Uncertified material that is installed shall be removed by the GEOSYNTHETICS <br /> CONTRACTOR at no cost to the OWNER. <br /> C. Testing specified in this Section shall be performed for this project by a laboratory <br /> approved by the QA/QC CONSULTANT. <br /> 1.4 CONSTRUCTION QUALITY ASSURANCE MONITORING <br /> A. The QA/QC CONSULTANT shall monitor installation as outlined in the CQA <br /> Manual. <br /> B. The GEOSYNTHETICS CONTRACTOR shall be aware of the activities outlined <br /> in the CQA Manual and account for these CQA activities in the installation <br /> schedule. <br /> 1.5 QUALIFICATIONS <br /> A. The GEOSYNTHETICS CONTRACTOR shall be experienced in the installation of <br /> GCLs. In the event the GEOSYNTHETICS CONTRACTOR is not experienced, a <br /> representative of the GCL Manufacturer shall be on site to train the <br /> GEOSYNTHETICS CONTRACTOR, at no additional cost to the OWNER. <br /> FORWARD COMPOST FACILITY STORMWATER IMPROVEMENTS GEOSYNTHETC <br /> 02777 2 CLAY LINER 10 <br />