My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Prior to packaging the finished product, the manufacturer shall inspect each <br /> roll, over the entire surface area, for the presence of sewing needles. All <br /> needles shall be removed or the rolls shall be rejected. <br /> 4. The bentonite will be adhered to the backing material in a manner that <br /> prevents it from being dislodged when transported, handled, and installed in <br /> a manner prescribed by the manufacturer. The water content of the <br /> bentonite shall not be greater than eitherl2 percent,by weight. <br /> PART 3 EXECUTION <br /> 3.1 FAMILIARIZATION <br /> A. Prior to implementing any of the work described in this Section, the <br /> GEOSYNTHETICS CONTRACTOR shall become thoroughly familiar with the <br /> site,the site conditions, and the portions of the work falling within this Section. <br /> B. Inspection: <br /> 1. Prior to implementing any of the work of this Section, the <br /> GEOSYNTHETICS CONTRACTOR shall carefully inspect the installed <br /> work of all other Sections and verify that all such work is complete to the <br /> point where the installation of this Section may properly commence without <br /> adverse impact. <br /> 2. If the GEOSYNTHETICS CONTRACTOR has any concern regarding the <br /> installed work of other Sections, he should immediately notify the QA/QC <br /> CONSULTANT prior to start of work of the Section. Installation of the <br /> geosynthetic clay liner will be construed as GEOSYNTHETICS <br /> CONTRACTOR'S acceptance of the related work of all other Sections, <br /> including the subgrade. <br /> 3.2 ACCEPTANCE TESTING <br /> A. Upon delivery to the site, samples of the geosynthetic clay liner shall be removed by <br /> the QA/QC CONSULTANT and tested to ensure conformance to these <br /> Specifications. Only materials passing the acceptance tests shall be installed. <br /> B. Samples shall be selected by the QA/QC CONSULTANT in accordance with the <br /> procedure outlined in the CQA Manual. <br /> C. Samples shall be taken at the rate of one sample per lot or one per 100,000 sq. ft <br /> (9,300 sq. m), whichever is greater and tested for bentonite mass per unit area, peel <br /> strength and hydraulic conductivity. <br /> D. The QA/QC CONSULTANT will increase the frequency of sampling in the event <br /> that test results are negative. This additional testing shall be performed at the <br /> expense of the GEOSYNTHETICS CONTRACTOR. <br /> FORWARD COMPOST FACILITY STORMWATER IMPROVEMENTS GEOSYNTHETC <br /> 02777 5 CLAY LINER <br />
The URL can be used to link to this page
Your browser does not support the video tag.