My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
repair defects. Tests will be performed on both the geomembrane and on the field-constructed seams. <br /> A leak location test will be performed on the geomembrane following installation of the <br /> geomembrane. CQA inspection and testing procedures are defined in the Specifications <br /> (Appendix C)and in the CQA Manual(Appendix D). <br /> A 3-ft deep pan lysimeter is located in the southwest corner of the retention basin and is lined with a <br /> 60-mil HDPE geomembrane and a GCL. Coarse Gravel encompassed in geotextile is placed within <br /> the lysimeter. Access to the pan lysimeter is via an 18-inch dia HDPE perforated and non-perforated <br /> riser pipe that extends to the crest of the retention basin. <br /> Wind vents are incorporated into the retention basin slopes to prevent uplift of the liner system. The <br /> wind vents are located on 5-ft centers and approximately 8-inches downslope from the retention basin <br /> crest, within the 2-ft freeboard. The wind vents consist of a 1" dia hole cut into the HDPE <br /> geomembrance.The hole is covered by a 1-ft square patch of HDPE geomembrane welded on the top <br /> and bottom but open on the sides. <br /> The retention basin lining system will be anchored beyond the crest of the basin using an earth-filled <br /> anchor trench. The anchor trench consists of a 4-foot deep by 3-foot wide perimeter trench set back a <br /> minimum of 5-ft from the crest of the retention basin slope. <br /> Safety ladders are included at 50-ft intervals and are held securely within the anchor trenches using <br /> No.4 rebar. The safety ladders are composed of a 3-inch diameter UV protected nylon rope with <br /> rungs spaced at 2-ft intervals. The safety ladders are held in place at the bottom by a gravel log <br /> created by wrapping granular drainage material within a 16-oz nonwoven geotextile. The gravel logs <br /> are continuous along the basin toe and, in addition to securing the safety ladders,provide ballast for <br /> the lining system to aid in preventing uplift. An access ramp is also located along the north side of <br /> the retention basin. <br /> COMPOST FACILITY STORM WATER IMPROVEMENTS 3-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.