My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.3 INSTALLATION <br /> A. Deployment. <br /> 1. Give careful consideration to the timing and temperature during deployment. <br /> The GEOSYNTHETICS CONTRACTOR shall verify that (a)there is no <br /> bridging or stresses in the geomembrane and(b)there are no wrinkles in the <br /> geomembrane that will fold over when covering with soil material. Ideally, <br /> deployment,welding,and covering should all occur at the same temperature. <br /> In a practical sense the GEOSYNTHETICS CONTRACTOR should strive to <br /> perform these activities within as narrow a temperature range as practical, <br /> and avoid these activities during peak hot or cold conditions. <br /> 2. Panel Identification: Assign each panel an identifying code number of letter <br /> consistent with the GEOSYNTHETICS CONTRACTOR's submitted panel <br /> layout drawing. The coding is subject to approval by the QA/QC <br /> CONSULTANT. <br /> 3. Daily Panel Deployment: Deploy no more panels in one shift than can be <br /> welded or secured during that same shift. <br /> 4. Do not deploy in the presence of excessive moisture,fog,dew,precipitation, <br /> ponded water, or high winds. <br /> 5. Do not damage geomembrane by handling, by trafficking, or leakage of <br /> hydrocarbons or any other means. <br /> 6. Do not wear damaging shoes or engage in activities that could damage the <br /> geomembrane. <br /> 7. Unroll geomembrane panels using methods that will not damage, stretch or <br /> crimp geomembrane. Protect underlying surface from damage. <br /> 8. Use methods that minimize wrinkles and differential wrinkles between <br /> adjacent panels. <br /> 9. Remove wrinkled or folded material. <br /> 10. Place ballast on geomembrane that prevents uplift from wind. <br /> 11. Use ballast that will not damage geomembrane. <br /> 12. Protect geomembrane in area of heavy traffic by placing protective cover <br /> which is compatible with and will not damage geomembrane. <br /> 13. Repair damage to subgrade or other underlying materials prior to completing <br /> deployment of geomembrane. <br /> 14. Do not allow any vehicular traffic directly on geomembrane. <br /> 15. Visually inspect geomembrane for imperfections. Mark faulty or suspect <br /> areas for repair. <br /> 16. Install material to account for shrinkage and contraction while avoiding <br /> wrinkles. Install material stress-free with no bridging before it is covered. <br /> Add material as needed to avoid bridging. <br /> 17. Before wrinkles fold over, attempt to push them out. For wrinkles that <br /> cannot be pushed out, cut them out and repair cuts prior to burial or at the <br /> direction of the QA/QC CONSULTANT. <br /> 18. Use slip sheet when deploying textured geomembrane over geotextiles to <br /> avoid damaging geotextile fibers. <br /> 19. Single-sided 60-mil textured HDPE geomembrane shall be installed in <br /> continuous contact with the underlying material and with the textured side <br /> facing down. <br /> Forward Compost Facility Stormwater Improvements <br /> 02778 11 HDPE GEOMEMBRANE <br />
The URL can be used to link to this page
Your browser does not support the video tag.