Laserfiche WebLink
1 INTRODUCTION <br /> 1.1 Purpose <br /> This Construction Quality Assurance(CQA)Manual has been prepared for Forward,Inc.(Forward) <br /> by a Registered Civil Engineer in accordance with Title 27,California Code of Regulations(CCR), <br /> Division 2, Sections 20323 and 20324, titled "CQA Plan and CQA Requirements." This manual <br /> describes CQA procedures for construction of the lined compost facility retention basin at the <br /> Forward Landfill. The CQA Manual outlines the specific field and laboratory testing and monitoring <br /> procedures required to demonstrate that the compost facility retention basin is constructed in <br /> accordance with Title 27 requirements. <br /> Following the completion of the work for the compost facility retention basin,the Quality Assurance/ <br /> Quality Control (QA/QC) Consultant will prepare a final CQA Report. The CQA Report shall be <br /> submitted to the Owner within 20 days of construction completion. The purpose of the CQA Report <br /> is to document that the materials and construction processes comply with the design and regulatory <br /> requirements. As-built drawings shall also be included. <br /> 1.2 Project Description <br /> Lewis Engineering designed the compost facility retention basin in accordance with Forward's Waste <br /> Discharge Requirements (WDR Order No.R5-2014-0006) and applicable state and federal <br /> regulations. The provisions of particular importance regarding the design are: <br /> • The retention basin was sized for all runoff and direct precipitation from the 25-year, <br /> 24 hour storm and maintain a 2-ft freeboard. <br /> • The retention basin is equipped with a synthetic liner and designed and operated to <br /> minimize the downward percolation of constituents. <br /> The compost facility retention basin will be located in the current sedimentation pond area,directly <br /> west of the compost facility. The retention basin will be lined with a 60-mil single sided textured <br /> HDPE geomembrane underlain by a geosynthetic clay liner. The retention basin will encompass <br /> approximately 2-acres and will extend approximately 240 feet in the north-south dimension and <br /> 460 feet in the east-west dimension.The crest of the retention basin is at elevation 35-ft. The base of <br /> the retention basin ranges from elevation 21-ft in the southern corner to 26-ft in the northeast. A pan <br /> lysimeter is located under the lining system in the southwest corner of the basin. <br /> The basin has a total capacity of 760,600 cf(approx. 5.7 million gallons)and 598,700 cf(approx.4.5 <br /> million gallons)not including the 2-ft freeboard. Compost runoff water sheet flows to perimeter v- <br /> ditches which direct the runoff to two pond inlet pipes/culverts. The inverts of the pipe inlets at the <br /> pond are at elevations 31.71 and 32.66-ft for the north and south inlets, respectively. The pond is <br /> designed to have sufficient storage capacity to maintain the runoff from the 25-yr,24 hr storm below <br /> Page I <br />