Laserfiche WebLink
APPROX 5300 ft <br /> 1 MW-13 <br /> ENORTH BORROW ' I FORWARD LANDFILL <br /> t --NEWCASTLE AREA SURVEY CONTROL POINTS <br /> ROAD \" POINT NO. NORTHING EASTING ELEVATION DESCRIPTION <br /> I---------------------` 1 2140048.9121 6364551.1709 40.9700 SJGO BRASS DISC <br /> - i I 2 2142696.0930 6364455.5790 42.1472 DISK +0.76 TO RIM PT-2 <br /> to 2140995.9410 6364497.1690 42.4500 SEI 1 BM 0-29.8 m <br /> ! i M W- . 3 2142681.2072 6364289.0217 43.4400 SEI 3 CHISL D CROSS c <br /> ( I I <br /> 1 i MW-1Uf�f 4 2142658.0778 6361840.9580 36.4100 SEI 4 1/2 <br /> I 1 ® EXISTING LOW FLOW I 7 2144926.8050 6359092.2740 34.4300 SEI 7 8M P-29 <br /> L---------------------------- --- -------I CREEK CROSSING 10 2146477.4100 6359070.3740 35.5571 SEI 10 REBAR CAP <br /> I� EXISTING LOW FLOW EXISTING ABOVE EXISTING OVERHEAD n <br /> EXISTING GROUND LANDFILL"", 94 2145843.9670 6364352.2380 44.7200 SEI 14 BM 0-28.6 q <br /> I : CREEK CROSSING '; WATER �pELL ,:, @qs plpE ELECTRICAL UNE 2140263.1050 6361 969.7980 39.3200 <br /> SIR-9A -- SGP_1p6 S>3P-}4 SAN JOA4R� COUNTY BENCH MARK 0-29.8 ON THE NW CORNER OF p <br /> AUSTIN BRIDGE ACROSS LITTLE JOHN CREEK <br /> •/1 MW-9 Mw-7 MW-4 MW-6 -o ELEVATION = 42.45 NGVD29 <br /> EXISTING LANDFILL <br /> _ �> <br /> FORMER AUSTIN IANDpLL <br /> GAS RECOVERY PLANT <br /> --FORMER ��_�� �� J <br /> c- <br /> } o� _ - f�l r i ORAGE CONTAINERS I) <br /> - yox�- <br /> AND GROUNDWATER m <br /> wMu \J I/',� C TREATMENT PLANT I <br /> SOP 7A WMU -1sa- WMU FU-04 W U FU <br /> ' WMU FU-05 WMU FU-06 - EXISTING <br /> 1 FU-04 t{TART-03 IWfrosli / ( o S I WATER WELL p <br /> (" .' POR7TbN PORTION PORTION <br /> ✓� L j .l -EXISTING <br /> ELEm <br /> OVERHEAD <br /> - o �� C � �' Cl ItICAI UNE O <br /> 3� B Q AUSTIN O T <br /> ROAD <br /> IIS _ - qPP <br /> LIMITS 0 ;04 I V F rn N <br /> �II I a 5 EASTERNEXISTING OVERHEAD <br /> Do <br /> BORRON .IL TELEPHONE ®� <br /> I O q rn <br /> `l <br /> WMU A 0 ... WMU 6 WMU WMU U STOCKPIL Q q 0 0� <br /> wM 03 FU_lFU-14 � <br /> E RN0 b. CONSTRUCTION Cq� N <br /> IMENTATI � - m ��''a z ACCESS RAMP O Z of <br /> POND „ .�: e O (SEE NOTE 6) rn g o <br /> ___ ___ _�) rn t <br /> - 0. <br /> _ } _ <br /> �� D, UNE -a. 14 4B O� <br /> MW-2 MW-3A CI - - - _ �_ <br /> FORWARD LEGEND: (� <br /> TMW1 ORWARDLANDFILL • MW-2 - GROUNDWATER MONITOR WELL Z <br /> LAPIDFILL ACCESS ROAD LANDFILL ENTRANCEGP-6 - LANDFILL GAS PROBEAPPROXIMATE GP-1-4� MW-18 OFFICE SGP-4A- LANDFILL GAS PROBECONSTRUCTION -2 28 W Z Ii o <br /> 80UND RTY LWATER SUPPLY Lu <br /> - PAVED- <br /> V AUSTIN ROAD NOTES: O <br /> WMU D-95 WMU D-9 _ <br /> WMU A -1 138 1. THE TOPOGRAPHIC MAP IN THE COMPOST AREA WAS PREPARED BY TETRA TECH, INC. F 6 <br /> WMU D-02SINACTIVE BASED ON A LOW ALTITUDE, HIGH PRECISION AERIAL SURVEY AND COMPUTER ASSISTED Z U o n <br /> WMU <br /> I l L1MfTS) N & PHOTOGRAMMETRIC METHODS. THE AERIAL SURVEY WAS PERFORMED ON JUNE 4, 2014 AND Lu o` Q <br /> CONTROL FOR THE TOPOGRAPHIC MAP WAS SET BY RJA & ASSOCIATES, USING CCCS ZONE III, (� Z <br /> -161 NAD 83. THE TOPOGRAPHIC MAP IN THE LANDFILL AND BORROW AREAS BETWEEN NORTH CREEK q <br /> s <br /> WMU D-94 AND ENTRANCE ROAD WAS PREPARED BY TETRA TECH, INC. BASED ON A LOW ALTITUDE, HIGH Lu <br /> PRECISION AERIAL SURVEY AND COMPUTER ASSISTED PHOTOGRAMMETRIC METHODS. THE AERIAL W q _ v <br /> WMU D-97 GP-7 SURVEY WAS PERFORMED ON JANUARY 16, 2014 AND CONTROL FOR THE TOPOGRAPHIC MAP O w x <br /> OP-2 I W D- WAS SET BY RJA & ASSOCIATES, USING CCCS ZONE III, NAD83. THE TOPOGRAPHIC MAP FOR O U <br /> MW-21 THE REMAINING AREAS WAS PREPARED USING COMPUTER ASSISTED, PHOTOGRAMMETRIC METHODS <br /> I WMU C BY HJW GEOSPATIAL, INC., IN OAKLAND CALIFORNIA ON MARCH 13, 2013. IN AREAS OF DENSE <br /> I VEGETATION, ACCURACY OF CONTOURS MAY DEVIATE FROM ACCEPTED ACCURACY STANDARDS. THE z <br /> WMU 6 <br /> WMU D-98 HORIZONTAL COORDINATE GRID IS BASED ON A LOCAL, ASSUMED COORDINATE SYSTEM. <br /> WMU D-01 WMU 87 ----APPROXIMATE ELEVATIONS ARE BASED ON NGVD 1929. <br /> PRO- WMU D-99 WMU -88 N BOUNDS 2. TOPOGRAPHIC INFORMATION MAY HAVE BEEN MODIFIED SUBSEQUENT TO THE DATE OF THE 1N' V <br /> TOPOGRAPHIC SURVEYS DUE TO LANDFILL OPERATIONS. THE CONTRACTOR SHALL VERIFY THE w <br /> PROPERTY UNE GRADES IN THE AREA OF WORK PRIOR TO THE START OF CONSTRUCTION. m <br /> D 88 3. FOLLOWING CONSTRUCTION, THE CONTRACTOR SHALL REGRADE DISTURBED AREAS TO Z -O <br /> r DRAIN TOWARDS EXISTING SITE DRAINAGE FACILITIES. J q d q <br /> } WMU D-00 EASTERN �`2 0- <br /> EXISTING I PIT , 4. THE CONTRACTOR SHAM COORDINATE ALL CONSTRUCTION ACTIVITIES WITH ONGOING � I-- <br /> SEDIMENTATION Gp_ 6P-6 LANDFILL OPERATIONS. 3BASIN O 0. <br /> NCL <br /> EXISTING LEACHATE 5. EXCAVATION IN BORROW AREA SHALL NOT EXTEND BELOW GRADES SHOWN. TOP SOIL ¢ V <br /> f IMPOUNDMENT ' - IN BORROW AREA SHALL BE STRIPPED AND STOCKPILED AS DIRECTED BY OWNER. 299 <br /> 3 1 `_ �O� n. <br /> STORM <br /> O <br /> OVERHEAD. MW-2 %l" .OMPOST DITCHESWATER LL <br /> ELECTRICAL LINE / / �� CILITY <br /> 0 300' 600' RETENTION ..;�° Z <br /> SCALE IN FEET <br /> Sheet2of <br /> $_ <br /> SOUTHL� FORK-OF � . �'- ��_ -.� -- .� �. Rev <br /> CREEK"EASEMENT <br />