Laserfiche WebLink
Forward Landfill HYDROLOGY <br /> Compost Pond 07/17/2014 <br /> STAGE-STORAGE CURVE <br /> 36 <br /> 34 <br /> FREEBOARD <br /> 32 <br /> LU <br /> 30 <br /> PROCESS WATER <br /> 28 <br /> 26 <br /> 24 <br /> 22 <br /> VOLUME(AC-FT) <br /> Notes: ~~ <br /> (1)All overland slopes are <br /> relatively flat(less than 2Y6) <br /> with shallow flow. Channel <br /> slopes are less than 0296 <br /> Potential erosion and <br /> sedimentation islow. <br /> (2)From water budget the maximum operational storage occurs inJanuary. <br /> (3)Maximum of Flood or Process volume plus sediment volume. Does not include 2'freeboard. <br /> (4}Total storage volume including freeboard from stage storage curve. <br /> (5)Freeboard volume iastorage provided less volume required. <br /> (8)Freeboard depth istaken from the stage nmmge'oume. <br /> (7)Required freeboard depth is equal to the minimum freeboard plus the direct precipitation for the 25YR storm. <br /> (8)25year 24hour storm rainfall from NOAA14. <br /> (8)Reserve freeboard isthe provided less the required. <br />