My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Landfill HYDROLOGY <br /> Compost Pond 07/17/2014 <br /> STAGE-STORAGE CURVE <br /> 36 <br /> 34 <br /> FREEBOARD <br /> 32 <br /> LU <br /> 30 <br /> PROCESS WATER <br /> 28 <br /> 26 <br /> 24 <br /> 22 <br /> VOLUME(AC-FT) <br /> Notes: ~~ <br /> (1)All overland slopes are <br /> relatively flat(less than 2Y6) <br /> with shallow flow. Channel <br /> slopes are less than 0296 <br /> Potential erosion and <br /> sedimentation islow. <br /> (2)From water budget the maximum operational storage occurs inJanuary. <br /> (3)Maximum of Flood or Process volume plus sediment volume. Does not include 2'freeboard. <br /> (4}Total storage volume including freeboard from stage storage curve. <br /> (5)Freeboard volume iastorage provided less volume required. <br /> (8)Freeboard depth istaken from the stage nmmge'oume. <br /> (7)Required freeboard depth is equal to the minimum freeboard plus the direct precipitation for the 25YR storm. <br /> (8)25year 24hour storm rainfall from NOAA14. <br /> (8)Reserve freeboard isthe provided less the required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.