Laserfiche WebLink
MARTIN DAIRY <br /> Operation Plan and Details of Project <br /> Duration of the packing waste xvill run from July=to in it] <br /> October. f <br /> Turnover rate for wet-totnato waste vs ill be fell off with 10 <br /> 24 hours. <br /> Storage arca for wet-tomato vv aste is lined n ith concrete. <br /> A waste storage pond is locate next to storage area for <br /> collecting rolloff. <br /> Amount of eannery mud is apprwOmately 6 loads per acre <br /> (90 lolls),not to exceed the needs of the crops. <br /> MARTIN DAIRY <br /> Operation Plan nand Details ofProi, <br /> "Tractor and scraper will be used to evenly distribute <br /> �cannery mud throughout the crop land. <br /> Cannery mud n ill be promptly disced into the soil to <br /> minimize odors and hreedim-of vectors. <br /> Professional pest control company(Clark)is currenth <br /> used for vector control at the site. <br /> Alternate access roads are available to receive product in <br /> case of unseasonable Ni eather: <br /> Wet-Waste Storage Area <br /> ; ` . <br /> t <br /> North to Northeast <br />