My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:27:23 PM
Creation date
7/3/2020 11:20:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_1
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-5 <br /> land. The permitted maximum daily throughput for the Compost Facility is 1,100 tons, <br /> however, actual throughput, including volume of each feedstock, will depend on the <br /> composting technology and the availability of the feedstock. Feedstock tonnages will not <br /> exceed 100,000 tons annually without prior notification and approval of the LEA. <br /> 1.3.1 Maximum Daily Load Capacity <br /> The permitted maximum daily throughput for the Compost Facility is 1,100 tons per day <br /> (tpd) as allowed under SWFP No. 39-AA-0020. The maximum daily load capacity to the <br /> Compost Facility will depend on the composting technology employed. Forward chooses to <br /> operate with windrow composting using a windrow turning machine. The maximum daily <br /> load capacity for this option is presented below. Additional options may be investigated in <br /> the future, if necessary. <br /> Windrow Composting Using a Windrow Turning Machine <br /> The maximum daily load capacity of the Windrow Compost Facility using a windrow turning <br /> machine is approximately 1,100 tpd. This capacity is based on the following assumptions: <br /> ♦ Six-day per week operations. <br /> ♦ Up to approximately 8 acres for compost windrows. <br /> ♦ New windrows are up to approximately 15 feet wide at the base with approximately 8 <br /> feet between Windrows for water addition and fire control. <br /> ♦ New windrows are up to approximately 7 feet high. <br /> ♦ Composting period is projected to be approximately 4 to 12 weeks depending on <br /> product desired. <br /> ♦ 40 percent volume reduction after composting. <br /> Figure 4 depicts the windrow composting using a windrow turning machine option. The <br /> facility design capacity is discussed in Section 1.3.4 and calculations are included in <br /> Appendix B. <br /> Sufficient space to store materials during peak operating periods without infringing upon <br /> traffic flow or equipment operation is available at the facility. In instances of emergency <br /> situations where the inflow rate could be increased and/or additional waste storage is <br /> needed, the LEA is contacted to coordinate the best procedures to minimize potential short- <br /> term environmental nuisances and public health issues and complaints. During periods of <br /> peak loading, the unloading area may be expanded to accommodate higher hourly inflow <br /> rates and minimize the potential for customer traffic stacking out onto Austin Road. The <br /> vehicle queuing/stacking area leading up to the scales and fee booth is sufficient and <br /> proven adequate during peak loading. Additional manpower and equipment will be <br /> available, as needed, during periods of peak loading. At no time will the site exceed the <br /> 1,100 tpd (for the Composting Facility) or 8,668 tpd (for the combined Forward Landfill, <br /> RRF, and Composting Facility) permitted maximum for all wastes and materials. <br /> 1.3.2 Average Daily Throughput <br /> The combined maximum tonnage for the Forward Landfill, RRF, and Composting Facility is <br /> 46,080 tons per week (not to exceed 8,668 tpd). The total permitted throughput for the <br /> RRF is 3,080 tpd and as previously mentioned, the total maximum daily tonnage for the <br /> Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information-November 2014 <br /> z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2013-14\resi 2014\text\9-nov 2014 track changes\sec 1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.